Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$20.6K
Most recent job
1.9y ago
Nov 13, 2024
13 permits on record. Values are declared at filing.
Nov 13, 2024
$75K
Remodel 2 bathroom, convert 1st bathroom: bath tub to floor shower 2nd bath: replace toilet,tile and vanity kitchen: replace cabinets and counter top all replaced in the same place
1520 Taylor StNob Hillcomplete#Kitchen remodel#Bathroom remodel
Oct 27, 2023
$20K
Unit #212: remodel (1) bathroom- replace sink, toilet, tile.
201 Harrison StFinancial District/South Beachcomplete#Bathroom remodel
Feb 1, 2023
$50K
1) remove tub and make it a shower, replace vanity. 2) replace shower valve.
250 King StMission Baycomplete#Bathroom remodel
Feb 4, 2022
$21.1K
Replace kitchen cabinets, counter top, bathroom tiles & shower head, keep (e) tub, replace vanity, paint
1 Daniel Burnham CtWestern Additioncomplete#Kitchen remodel#Bathroom remodel
Dec 2, 2021
$15K
Shower (n) tile. kitchen counter top replace only. add (n) sink in bathroom, replace shower head only
105 Liberty StMissioncomplete#Kitchen remodel#Bathroom remodel
Apr 26, 2021
$60K
Replace in kind - tile, carpet, handrails, lights, hailbox. lobbly only - common area.
1520 Taylor StNob Hillissued
Jul 26, 2018
No cost listed
Relocate (1/2) bathroom, (1) toilet, (2) shower pans
688 Clipper StNoe Valleycomplete#Bathroom remodel#Plumbing
Jul 26, 2018
No cost listed
Replace (e) baseboard heater, same system
688 Clipper StNoe Valleycomplete#Plumbing
Jul 26, 2018
No cost listed
Replace recess lighting, add 1 subpanel70 amp, 8 circuits, 2 feeders 100amp-80amp; 14 lights 12 switches, 15 receptacles, 1 garbage disposal, 1 microwave, 1 range,
688 Clipper StNoe Valleycomplete#Electrical
Jun 15, 2018
$215K
Interior remodel: reconfig kitchen & poweder @2/f, reconfig master bath @3/f, rpelace fixtures & finishes at 2 baths on 1/f, new windows & door throughout. exterior: reconfig rear doors & windows @1st, 2nd, 3rd. replace tile & railing at rear decks. new wndow at stairwell. new railing at front stair
688 Clipper StNoe Valleycomplete#Windows#Kitchen remodel#Bathroom remodel#Decks & stairs
Nov 21, 2017
$7.7K
Raise driveway- remove approx 8 feet of (e) drivway inside p.l. form and pour approx six inches higher to accomodate low clearance automobile. no work within the p.r.w.
1580 Fulton StLone Mountain/USFcomplete#Garage & driveway
Aug 18, 2017
$3.5K
Add trim at the bottom of the windows and at the front of the building total 11 windows.
10 Loyola TrLone Mountain/USFcomplete#Windows
Aug 10, 2017
$9.8K
Replace all windows at front (south) elevation in (e) openings w/ marvin ultimate alum clad wood windows. replace (2) entry doors with wood panel doors: u factor not > .32
1580 Fulton StLone Mountain/USFcomplete#Windows