Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
7.4y ago
May 23, 2019
11 permits on record. Values are declared at filing.
May 23, 2019
No cost listed
Work category: 5p; installation of (1) ada compliant restroom consisting of (1) water closet, (1) wall hung lavatory and (1) insta-hot point of use water heater.
2077 Market StCastro/Upper Marketcomplete#Water heater
Mar 27, 2019
No cost listed
To correct pp20190219229 from 1030 polk st to 1038 polk st.
1038 Polk StTenderloinexpired#Plumbing
Mar 27, 2019
No cost listed
Installation of 1 ada compliant restroom, 1 water closet, 1 wall hun lavatory.
2081 Market StCastro/Upper Marketcomplete#Plumbing
Feb 18, 2019
No cost listed
Commercial ti, install (2) bathrooms, one ada bath, one non-ada
1038 Polk StTenderloincomplete#Bathroom remodel#Plumbing
Dec 12, 2018
No cost listed
Addition of 3 adu per bpa 2016-1216-5173. new plumbing for 3 kitchen, 3 bathoroms, 3 laundry rooms and 3 shower pans.
3560 Divisadero StMarinacomplete#Bathroom remodel#Plumbing
Nov 12, 2018
No cost listed
Installation of 1 ada compliant restroom, 1 water closet, 1 wall lavatory, 1 waterless urinal.
3264 Mission StBernal Heightscomplete#Plumbing
Nov 12, 2018
No cost listed
Installation of 1 ada compliant restroom, 1 water closet, 1 wall lavatory.
693 14th StCastro/Upper Marketcomplete#Plumbing
Sep 17, 2018
No cost listed
Plumbing work for installation of new adu. (1) bathroom, (1) kitchen sink, (1) laundry box.
2115 Hyde StRussian Hillcanceled#Bathroom remodel#Plumbing
Aug 14, 2018
No cost listed
Installation of (1) ada compliant restroom
910 Valencia StMissioncomplete#Plumbing
Feb 25, 2018
No cost listed
Installation of (1) restroom consisting of (1) bathtub, (1) water closet, (1) double vanity sink, (1) kitchen sink, (1) sewer ejection pump to discharge to city lateral. ref bldg permit #201611172995
1320 Page StHaight Ashburycomplete#Plumbing
Dec 19, 2017
No cost listed
Upgrade (e) bathroom to ada requirments.
2109 Market StCastro/Upper Marketcomplete#Bathroom remodel#Plumbing