Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$61.6K
Most recent job
2mo ago
Aug 4, 2026
12 permits on record. Values are declared at filing.
Aug 4, 2026
$77.7K
Unit 903: kitchen remodel like for like, new cabinets, sink, counter tops, p traps, replace gfci receptacles, swicth lights under cabineys, install new flooring, new dishwasher. bathroom remodel, new vanity, sink, angle stops, p traps, vanity tops, replace 2 lights, 2 gfci switch, shower head.
150 Lombard StFinancial District/South Beachissued#Kitchen remodel#Bathroom remodel
Aug 4, 2026
No cost listed
Unit# 903: kitchen area replace all gfci receptacles, swtiches. replace living room receptacles, switches. replace bedroom switches, plugs. bathroom replace gfci outlets, switches, install 2 scone light fixtures.
150 Lombard StFinancial District/South Beachissued#Electrical
Aug 4, 2026
No cost listed
Unit# 903: kitchen area install kitchen sink, p-traps, angle stop, all sink fixtures, faucet, airgap, soap dispenser. bathroom area - install sink, ptraps, repalce angle stops.
150 Lombard StFinancial District/South Beachissued#Bathroom remodel#Plumbing
Jul 21, 2025
No cost listed
Add one hand sink in kitchen, change location of dish washing sink from right to left side of kitchen
525 Valencia StMissioncomplete#Plumbing
Jun 18, 2025
No cost listed
1st floor: remove and replace outlets throughout restaurant.
525 Valencia StMissioncomplete#Electrical
Jun 18, 2025
No cost listed
1st floor - replacing water heater
525 Valencia StMissioncomplete#Water heater
Dec 3, 2024
No cost listed
Water heater (ok to process per inspector ray damied)
167 Leland AvVisitacion Valleycomplete#Water heater
Jun 24, 2024
No cost listed
New 200 amp sub panel 2-240 v outlet 40 receptacles
167 Leland AvVisitacion Valleycomplete#Electrical
Jun 24, 2024
No cost listed
Repair underground sewer (n) plumbing line to connect (e) prep sink (e) 3 comp sink, (e) hand sink (n) floor drain
167 Leland AvVisitacion Valleycomplete#Plumbing
Jan 12, 2024
$45.6K
2/f -bathroom remodeling convert full bathroom to a hlaf bath and extend full bathroom, upgrade plumbing, upgrade electrical, install insulation to entire bathroom, convert walking shower to bath tub, install double vanity and 24' vaniaty for half bathr, add toilet for full bathroom, drywalls, tiles
2323 14th AvWest of Twin Peaksissued#Bathroom remodel#Plumbing
Jan 11, 2024
No cost listed
2/f: upgrade plumbing. install drain for new bath tub, bidet, toilet, and vanities. install vent pipes and pipe lines
2323 14th AvWest of Twin Peakscomplete#Bathroom remodel#Plumbing
Jan 11, 2024
No cost listed
2/f: upgrade all electrical wiring in the bathroom only. install 4 receptacles, recessed lights for ceilings, sconces, exhaust fans. outlet for bidet.
2323 14th AvWest of Twin Peakscomplete#Electrical