Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$140K
Most recent job
2.2y ago
Aug 6, 2024
8 permits on record. Values are declared at filing.
Aug 6, 2024
$100K
Voluntary strengthening at foundation - new concrete foundation footings cast against existing brick foundation at corners of outer building perimeter and inner building courtyard. new collector elements at g/f framing.
173 Fair Oaks StMissioncomplete#Foundation
Jul 15, 2022
No cost listed
Structural revision to approved permit 201912311053
983 Capp StMissioncomplete
Jul 15, 2022
No cost listed
Structural revision to approved permit 201912311057
983 Capp StMissioncomplete
Jul 15, 2022
No cost listed
Structural revision to approved permit 201912300957. (n) concrete foundation & wood framing.
989 Capp StMissioncomplete#Foundation
Dec 31, 2019
$130K
Rear bldg. add unit per ord 162-17. add 1 adu-1 bedroom unit at the (e) rear detached garage, with a (n) kitchen and a (n) bath.
983 Capp StMissioncomplete#Kitchen remodel#Bathroom remodel#ADU & in-law units
Dec 31, 2019
$170K
Front bldg. add 2 adu's per ord 162-17. two 1 bedroom units at 1/flr of (e) 3-story bldg. inclds 1 kitchen & 1 bath at each (n) unit. reference ab-094 voluntary seismic soft story pa# 201912230412 and separate unit legalizaiton under pa# 201912300957.
983 Capp StMissioncomplete#Kitchen remodel#Bathroom remodel#Seismic retrofit#ADU & in-law units
Dec 30, 2019
$140K
Unit legalization ord 43-14. legalize 1 (e) unit at 1/fl of (e) 3-story building. the (n) unit will be a 2 bedroom unit with a kitchen, a bath and a powder room. (e) rear detached garage not in scope.
983 Capp StMissioncomplete#Kitchen remodel#Bathroom remodel
Sep 8, 2017
$149.4K
Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4; maher ord 155-13 na
2330 17th StMissioncomplete#Seismic retrofit