Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
3mo ago
Jul 9, 2026
84 permits on record. Values are declared at filing.
Jul 9, 2026
No cost listed
Work category: 6pa; ground floor: repair one (1) drain pipe for an existing floor drain.
181 03rd StFinancial District/South Beachcomplete#Plumbing
May 19, 2026
No cost listed
Work category: 5p; rough in and trim waste, vent, domestic hot and cold water as needed for: one (1) kitchen sink and faucet, one (1) garbage disposal, one (1) flood stop, one ice and coffee maker, one (1) r.p.b.f. rerough the existing fixtures as needed for: two (2) toilets, two (2) urinals, six (6) lavs and faucets, one (1) high-low drinking fountain with bottle filler, one (1) standard drinking fountain.
300 Mission StFinancial District/South Beachissued#Plumbing
Oct 1, 2025
No cost listed
Work category: 5p; suite # 1700 & # 1705: rough in and trim waste, vent domestic cold water as needed for: two (2) coffee sinks and faucets, two (2) garbage disposals, two (2) dishwasher connections, two (2) instantaneous water heater, two (2) flood stoppers
655 Montgomery StChinatowncomplete#Water heater
Apr 23, 2025
No cost listed
Work category: 5p; 7th floor: rough in and trim waste, vent domestic hot and cold water as needed for: 2 toilets,l 2 lavs and faucets, 1 mothers sink and faucet, 3 instantaneous water heaters, one floor stop.
333 Bush StFinancial District/South Beachcomplete#Water heater
Mar 13, 2025
No cost listed
Work category: 5p; test only one existing gas pipe, to obtain an inspectors pink tag for pg&e to install a gas meter
7 Warriors WyMission Baycomplete#Plumbing
Jan 20, 2025
No cost listed
Work category: 5p; suite: 2100..install only using the existing in wall plumbing rough in: one (1) coffee sink, one (1) instantaneous waater heater, one (1) dishwasher, one (1) garbage disposal,one (1) flood stopper
1 Post StFinancial District/South Beachcomplete#Plumbing
Jan 12, 2025
No cost listed
Work category: 6pa; suite : 16 rough in and trim waste, vent, domestic hot and cold water and natural gas and condensate piping as needed for: three (3) floor sinks, one (1) floor drain, one (1) 3 compartment sink, one (1) food prep sink, two (2) hand sinks, one (1) 50-gallon water heater, one (1) ice machine, one (1) fill faucet, one (1) fryer, one (1) wok, one (1) range, one (1) stock pot,one (1) mau unit, two (2) heat pumps, one (1) flood stop.
1 Warriors WyMission Baycomplete#Plumbing#Water heater#Heating & cooling
Oct 9, 2024
No cost listed
Work category: 5p; suite # 1500: rough in and trim waste, vent domestic hot and cold water as needed for: one (1) new coffee sink and faucet, two (2) instantaneous water heaters, two (2) glass fillers, two (2) water filters, two (2) dishwashers, two (2) flood stoppers, one (1) drinking fountain. relocate the existing in wall plumbing as needed for: one (1) existing sink, two (2) toilets, two (2) urinals, lower the water for one (1) toilet
333 Bush StFinancial District/South Beachcomplete#Plumbing#Water heater
Sep 10, 2024
No cost listed
Work category: 5p; 14th floor: rough in and trim waste, vent domestic cold water as needed for: one (1) drinking fountain, one (1) coffee sink and faucet, one (1) toilet, one (1) dishwasher, one (1) instantaneous water heater, one (1) garbage disposal, one (1) instanthot water dispenser, two (2) flood stopper.
140 New Montgomery StFinancial District/South Beachcomplete#Water heater
Mar 26, 2024
No cost listed
Work category: 5p; 10th floor: ropugh in and trim waste, vent and domestic cold water as needed for: one (1) high-low drinking fountain.
44 Montgomery StFinancial District/South Beachcomplete#Plumbing
Jan 29, 2024
No cost listed
Work category: 5p; veryify removal of existing fuel storage tank and piping
665 03rd StFinancial District/South Beachcomplete#Plumbing
Nov 16, 2023
No cost listed
Work category: 5p; 10th floor: rough in and trim waste, vent, domestic hot and cold water as needed for: one (1) coffee sink and faucet, one (1) instantaneous water heater, one (1) garbage disposal, one (1) ice and coffee maker outlet, one (1) dishwasher, one (1) water filter, one (1) flood stopper system.
44 Montgomery StFinancial District/South Beachcomplete#Water heater
Feb 9, 2023
No cost listed
Work category: 5p; 4th floor: rough in and trim waste, vent domestic hot and cold water as needed for: 5 toilets, 1 urinal,4 floor drains and trap primers, 5 lavs, 1 mop sink, 1 drinking fountain, 1 15 gallon water heater,1 coffee sink, 1 mothers sink, i instantaneous water heater, 1 disposal,1 instant hot, 1 dishwasher
55 New Montgomery StFinancial District/South Beachcomplete#Plumbing#Water heater
Jan 11, 2023
No cost listed
Work category: 5p; demo one (1) existing sink, one (1) existing shower
750 Battery StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Oct 28, 2022
No cost listed
Work category: 5p; # 2570: rough in and trim waste, vent and domestic hot and cold water as needed for: one (1) coffee sink and faucet, one (1) instantaneous water heater, one (1) garbage disposal, one (!) hot water dispenser, one (1) ice and coffee makers,one (1) dishwasher, one (1) flood stopper, one (1) rpbf.
595 Market StFinancial District/South Beachcomplete#Water heater
Oct 28, 2022
No cost listed
Work category: 5p; suite# 2550: rough in and trim waste, vent , domestic hot and cold water as needed for: one (1) coffee sink and faucet, one (1) instantaneous water heater,one (1) garbage disposal,one (1) hot water dispenser, one (1) ice and coffee maker, one (1) dishwasher, one flood stopper
595 Market StFinancial District/South Beachcomplete#Water heater
Oct 27, 2022
No cost listed
Work category: 5p; rough in and trim waste, vent and domestic hot and cold water as needed for: one (1) coffee sink and faucet, one (1) instantaneous water heater, one (1) garbage disposal, one (1) instant hot water dispenser, one (1) dishwasher, one (1) flood stopper.
160 Spear StFinancial District/South Beachcomplete#Water heater
Mar 31, 2022
No cost listed
Work category: 5p; 9th floor: rough in and trim waste, vent domestic hot and cold water as needed for: one (1) coffee sink and faucet, one (1) bar sink and faucet, one (1) garbage disposal, one (1) instantaneous water heater, one (1) valved outlet for coffee ice and coffee makers, espresso machine, one (1) quench water machine, one (1) dishwasher, one (1) reduced pressure backflow preventer, three (3) air-gap fittings and trap primers,
100 California StFinancial District/South Beachcomplete#Plumbing#Water heater
Feb 7, 2022
No cost listed
Work category: 5p; 4th floor: rough in and trim waste, vent, domestic hot and cold water as needed for: 5toilets,1 urinal,4 floor drains and trap primers, 5 lavs and faucets, 1 mop sink, 1 drinking fountain, 1 15 gallon water heater, 1 coffee sink and faucet, 1 lactation sink and faucet, 1 instantaneous water heater, 1 disposal, 1 instant hot, 1 dish washer
55 New Montgomery StFinancial District/South Beachcomplete#Plumbing#Water heater
Dec 2, 2021
No cost listed
Work category: 5p; 10th floor: rough in and trim waste, vent, domestic hot and cold water as needed for: one sink and faucet, one instantaneous water heater, one (1) garbage disposal, one dishwasher.
160 Spear StFinancial District/South Beachcomplete#Water heater