Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$3K
Most recent job
1mo ago
Sep 4, 2026
6 permits on record. Values are declared at filing.
Sep 4, 2026
No cost listed
Work category: 5m; installation of two fujitsu ceiling-suspended heat pump split systems serving two classroom areas at 735 fell street. scope includes installation of two indoor ceiling-suspended evaporator units, two outdoor heat pump condensers mounted on exterior wall brackets, refrigerant line sets, condensate pumps and drain routing, wired controllers, wi-fi interface kits, equipment startup, testing, and commissioning.
735 Fell StHayes Valleyissued#Heating & cooling#Plumbing
Jul 9, 2026
No cost listed
Installation of new dedicated 50a, 120/240v branch circuit for commercial popcorn machine including new 2-pole breaker, emt conduit, copper conductors, nema 14-50r receptacle, local disconnect switch, grounding/bonding, and final equipment connection.
1192 Market StTenderloincomplete#Electrical
Jan 28, 2026
$3K
Install 30ft of 4in rigid metal dryer exhaust duct, including exterior termination. install duct power ventilator with pressure sensing. comply with nov #202649134, item 3. terminate per cmc 502.2.1
2247 47th AvSunset/Parksidecomplete#Heating & cooling
Jan 27, 2026
No cost listed
Remove (e) damaged subpanel and replace with new subpanel rated 100a, 120/240v single phase. re-terminate (e) branch circuits, groundinng, bonding, and label circuits.
1040 Howard StSouth of Marketissued#Electrical
Jan 25, 2026
No cost listed
Upgrade overhead electrical service from 100a to 200a. install 40 space main service panel. new ridig service mast, riser, service conductors, install (2) 6 ft ground rods with grounding electrode; bond gas and piping. 3 new branch circuits (1-60a/240) (2-30a 120/240) (3-20a 120).
131 Concord StExcelsiorcomplete#Electrical
Jan 25, 2026
No cost listed
Like for like electrical panel replacement required by the property insurer due to known safety recall. scope includes controlled shut down, replacement of federal pacific panel boards, termination of feeder and circuits, labeling, torque verification and replacement of 150a main disconnect.
1855 California StWestern Additioncomplete#Electrical