Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
2mo ago
Aug 10, 2026
78 permits on record. Values are declared at filing.
Aug 10, 2026
No cost listed
Work category: 2pa; installation of (2) new self-contained duplex alternating pumps in the mechanical room, located in the parking garage.
450 Hayes StHayes Valleyissued#Plumbing
May 11, 2026
No cost listed
Work category: 2pa; - repipe gas from shut off at main to bank of (10) tankless water heaters. add new drip leg to each tankless gas supply. install new gas shut off at each tankless gas supply.
338 Potrero AvMissioncomplete#Plumbing#Water heater
Apr 17, 2026
No cost listed
Work category: 2pa; from existing gas line in floor, run new 3/4 gas line from 3rd floor up to 4th floor ceiling to new heater location. install future use tee to outside and cap, hookup to heater. extend gas line to other side of deck next to hose bib for future use.
520 Chestnut StNorth Beachissued#Plumbing
Jan 11, 2026
No cost listed
Work category: 1p; relocation of waste water vent for 1 laundry and new waste vent water for 1 bar sink
520 Chestnut StNorth Beachissued#Plumbing
Sep 17, 2025
No cost listed
Work category: 2pa; emergency installation. demo (1) failed boiler at building 6. supply and install (1) new 100-gallon 199k btu commercial gas water heater.
420 Berry StMission Bayexpired#Water heater#Heating & cooling
Dec 5, 2024
No cost listed
Work category: 2pb; rough top out, set customer supplied finish. - supply and install sump pumpin light well - relocate all fixtures as per plan - add new fixtures as per plan - trench for newpiping in basement floor and backfill by aquatek - new gas system as per drawing - run gas toexisting and new future meter location. - all new basement waste to connect to existing sewermain within foundation.
618 Eugenia AvBernal Heightscomplete#Plumbing
Nov 12, 2024
No cost listed
Work category: 2pa; installation of (2) new self-contained duplex alternating pumps in the mechanical room, located in the parking garage.
450 Hayes StHayes Valleyexpired#Plumbing
Aug 3, 2023
No cost listed
Work category: 2pa; rough plumbing of waste and water for master bathroom, kitchen, and hall bathroom. set customer supplied finish.
1161 Jackson StNob Hillcomplete#Bathroom remodel#Plumbing
Apr 4, 2023
No cost listed
Work category: 8p; obtain and install (2) raypak 750k btu natural gas hydronic boilers and related material on the rooftop of the tiffany garden hoa
199 Tiffany AvBernal Heightscomplete#Water heater#Heating & cooling
Mar 16, 2023
No cost listed
Work category: 2pa; 1. install new sewer, water, and vent piping for (1) new washing machine drain. 2. the new drain will be located in the wall to the right of the existing laundry sink location. 3. new cast iron sewer and vent piping will be installed. 4. a new laundry box with hammer arrestors will be installed. 5. new type "l" copper water piping will be installed and connected to the existing hot and cold water lines. 6. the new sewer and vent piping will be left on test for the city inspection.
2121 Webster StPacific Heightsexpired#Plumbing
Mar 13, 2023
No cost listed
Work category: 2pb; - rough top out, set customer supplied finish. - supply and install sump pump in light well - relocate all fixtures as per plan - add new fixtures as per plan - trench for new piping in basement floor and backfill by aquatek - new gas system as per drawing - run gas to existing and new future meter location. - all new basement waste to connect to existing sewer main within foundation.
618 Eugenia AvBernal Heightsexpired#Plumbing
Feb 6, 2023
No cost listed
Work category: 3pb; installation of new waste and vent piping for the washers in each unit of a 5-story building (15) units total. new hot, cold, and return lines needed for (2) laundry stacks. run new hot, cold, and return lines from the garage up to the 6th floor, through the new chase for (2) stacks. units 2,5,8,11,15 and units 1,4,7,10,14. new 2" gas mains to be ran from outside of the gas meter room to (3) individual risers to accommodate 100k btu's per unit for future use. run new gas line to ranges in units 1,2,3,8,9,10,11,12,14,15, and 16.
145 Laurel StPresidio Heightscomplete#Plumbing
Aug 17, 2022
No cost listed
Work category: 2pa; 1. supply and rough in (4) new delta r10000 multi choice rough shower valve only with (1) fixed head each. 2. set customer supplied finish trim for (4) shower valves (4) toilets (5) lavatories (1) kitchen (1) soaking tub only. 3. replace ice maker box with new.
308 Green StNorth Beachcomplete#Bathroom remodel#Plumbing
Aug 9, 2022
No cost listed
Work category: 2pa; connecting the sink/dishwasher/disposal in unit 202.
548 Brannan StSouth of Marketcomplete#Plumbing
Aug 9, 2022
No cost listed
Work category: 2pa; unit 114, split from unit 116: new gas line & new gas meter
548 Brannan StSouth of Marketcomplete#Plumbing
Aug 1, 2022
No cost listed
Work category: 2pb; emergency gas line repair - installation of new 2" pe gas pipe with tracer wire, installation of isolation valve and service tee.
1280 Laguna StWestern Additioncomplete#Plumbing
May 31, 2022
No cost listed
For unit 214 for gas tag issuance.
542 Brannan StSouth of Marketcomplete#Plumbing
May 12, 2022
No cost listed
Work category: 8p; removal of two condensing water heaters (boiler a & b) from the roof top of the blu condominiums. installation of two new lochinvar armor model awh0800 boilers (boiler c & d) boiler a: s/n c07188917 boiler b: s/n c06169597 boiler c: s/n 2216129221495 boiler d: s/n 2143123705143
631 Folsom StFinancial District/South Beachcomplete#Water heater#Heating & cooling
May 6, 2022
No cost listed
Connecting the sink/dishwasher/disposal in unit: 103, 108, 204, 210 and 410.
530 Brannan StSouth of Marketcomplete#Plumbing
May 6, 2022
No cost listed
Unit 208b: connecting the sink/dishwasher/disposal in unit.
208 Pennsylvania AvPotrero Hillcomplete#Plumbing