Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$80K
Most recent job
2.1y ago
Sep 16, 2024
12 permits on record. Values are declared at filing.
Sep 16, 2024
$80K
Remodel 2 bathrooms, remove and replace tub/shower combo and one shower, new heights ceiling fan, new tile walls, and new window.
1521 Rivera StSunset/Parksidecomplete#Windows#Bathroom remodel
Sep 16, 2024
No cost listed
Install 4 con lights, two ceiling fans , two gfci plugs
1521 Rivera StSunset/Parksideissued#Electrical
Sep 16, 2024
No cost listed
Remove and replace two vanity faucets & two showers
1521 Rivera StSunset/Parksidecomplete#Bathroom remodel#Plumbing
Apr 29, 2021
No cost listed
Kitchen remodel, remove wall between living room & dining room. move closet in bedrooms x2
2732 Diamond StGlen Parkcomplete#Electrical
Apr 29, 2021
No cost listed
Kitchen remodel.
2732 Diamond StGlen Parkcomplete#Plumbing
Dec 23, 2020
$80K
Remodel of upper unit: remove walls between ktichen, drining room & living room. kitchen remodel, move closets in bedrooms 1 & 3.
2732 Diamond StGlen Parkcomplete#Kitchen remodel
May 15, 2019
No cost listed
Revision to 201801178766 p a2.2 3rd fl, page a 2.1 2nd fl, page a2.0 1st fl changes at stair, wall at closets
129 Shawnee AvOuter Missioncomplete
May 15, 2019
No cost listed
Tie heat into (e) furnace for upstairs new 3/f
129 Shawnee AvOuter Missioncomplete#Heating & cooling
Jan 23, 2019
No cost listed
Replace water heater
129 Shawnee AvOuter Missioncomplete#Water heater
Aug 20, 2018
No cost listed
New electrical wiring as needed throughout addition. new lighting,m 10 switches, 10 receptacles, 2 fans
129 Shawnee AvOuter Missioncomplete#Electrical
Aug 20, 2018
No cost listed
Adding new bathroom on the third floor. new plumbing as needed throughout bathroom addition.
129 Shawnee AvOuter Missioncomplete#Bathroom remodel#Plumbing
Jan 17, 2018
$120K
Third story addition to rear of (e) building. add bedroom and bath
129 Shawnee AvOuter Missioncomplete#Bathroom remodel