Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$28K
Most recent job
2mo ago
Aug 20, 2026
100 permits on record. Values are declared at filing.
Aug 20, 2026
No cost listed
Ground level: according to approved plans, install new restroom vent. connection to (e) pipe to new vent line.
101 New Montgomery StFinancial District/South Beachissued#Plumbing
Aug 20, 2026
No cost listed
Ground level: according to the approved plans, provide and install new lighting fixtrues and electrical outlets as required for the remodel of the (e) coffee shop into new cocktail shop layout. all electrical work shall be performed in accordance w/ the approved plans and applicable electrical codes. (20) switches, (20) recpetacles, (2) dishwasher.
101 New Montgomery StFinancial District/South Beachissued#Electrical
Aug 20, 2026
No cost listed
Ground level: according to approved plans provide & install new plumbing fixtures, new plumbing for new layout of restroom, install new faucet, sink.
101 New Montgomery StFinancial District/South Beachissued#Plumbing
Feb 8, 2026
No cost listed
Install mini-split system
2036 Green StMarinaissued#Heating & cooling
Feb 8, 2026
No cost listed
Unit 1: add 2 bathrooms to basement w/ interior stair to 1st fl w/ 1 shower pan & underground
2036 Green StMarinaissued#Bathroom remodel#Plumbing
Feb 8, 2026
No cost listed
Ref to bldg pa# 202512081184, unit 1- new electrical wiring, lights, outlets, switches will be installed to basement, 100 amp sub panel adding
2036 Green StMarinaissued#Electrical
Jan 13, 2026
No cost listed
Rewire entire house & two bathrooms. 6 lights, 5 switches, 5 receptacles, 2 fans. upgrade (e) 100 amp main elec panel to 200 amp main elec panel with two elec meters one for adu one for main house ref 202109289310
45 Anzavista AvLone Mountain/USFissued#Electrical
Jan 13, 2026
No cost listed
Install two mini split system one for adu and one for main house
45 Anzavista AvLone Mountain/USFissued#Heating & cooling
Jan 13, 2026
No cost listed
Plumbing for adu and house remodel ref 202106259414
45 Anzavista AvLone Mountain/USFissued#Plumbing
Jan 7, 2026
No cost listed
Upgrade e) 100 amp main panel to 400 amps
2759 40th AvSunset/Parksideissued#Electrical
Jan 7, 2026
No cost listed
Install new mini-split system for 1st fl.remove (e)gas furnace and replace with new air handler
1180 Guerrero StMissionissued#Heating & cooling
Jan 7, 2026
No cost listed
Install 36 led lights,28 outlets,13 switches,provide power for new air handler,provide power for relocated washer & dryer,provide power for new ini-split system.
1180 Guerrero StMissionissued#Electrical
Jan 7, 2026
No cost listed
Convert ground floor storage to habitable space,add stair i rear yard.
1180 Guerrero StMissionissued#Plumbing
Dec 12, 2025
No cost listed
To obtain final inspection for work approved under pa 202308114215. all work is complete.
518 Connecticut StPotrero Hillissued
Dec 8, 2025
$200K
Add interior stairs from unit# 1 to basement and convert the storage rooms in the basement into habitable space. add 2 bedrooms and 2 bathrooms. add rear landing, rear firewall, and rear access door for common access.
2036 Green StMarinaissued#Bathroom remodel
Sep 18, 2025
$157K
Convert ground floor storage to habitable space, add 173 sf stair in rear yard
1180 Guerrero StMissionissued
Jul 31, 2025
No cost listed
Upgrade existing 100 amp elec. main pannel to new 200 amp elec. main panel
2759 40th AvSunset/Parksidecancelled#Electrical
Jun 25, 2025
$67.7K
Rewire for entir house, 7 skylights replacements in kind, 2 complete bathrooms remodel. no walls or layout changes. one shower pan. nothing is visible from the street.
45 Anzavista AvLone Mountain/USFissued#Windows#Bathroom remodel#Electrical
Jun 9, 2025
$35K
Revision to pa #202505076001. alterations to extg bathroom at 2nd floor. alterations to existing kitchen at 2nd floor. remove existing wall between kichen and living room. see structural drawing.
2715 37th AvSunset/Parksideissued
Jun 3, 2025
$15K
Rev to pa# 2024-0719-6907 comply with nov 201996671 and nov 202537203 dry rot repair of (e) exterior stair like for like more than 50% (front of house)
219 Moscow StExcelsiorcomplete#Decks & stairs#Siding & facade