Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$40K
Most recent job
4mo ago
Jun 16, 2026
20 permits on record. Values are declared at filing.
Jun 16, 2026
No cost listed
Add restroom on main level, add 2 bedroom, 2 bath on lower lvel
215 Thornton AvBayview Hunters Pointissued#Electrical
Jun 16, 2026
No cost listed
3 bathrooms and kitchenette
215 Thornton AvBayview Hunters Pointissued#Bathroom remodel#Plumbing
Jun 1, 2026
$94.8K
2.5 bathroom remodel in-kind. kitchen counter top replacement, minor relocation of 6 recessed lights. no wall or framing modification, all work is"non-structural" only.
42 Topaz WyGlen Parkissued#Kitchen remodel#Bathroom remodel
Jun 1, 2026
No cost listed
2.5 bathroom remodel in kind
42 Topaz WyGlen Parkissued#Bathroom remodel#Plumbing
Jun 1, 2026
No cost listed
2.5 bathroom remodel in kind. minor relocation of 6 recessed lights
42 Topaz WyGlen Parkcomplete#Electrical
Apr 23, 2026
No cost listed
Legalize ground floor, rumous room amd kitchenette and bathroom reconfiguration. 15 no. lights, 4 switches, 10 receptacles, 1 fans.
634 12th AvInner Richmondcomplete#Electrical
Apr 23, 2026
No cost listed
Legalize ground floor, rumors room kichenette and bathroom reconfiguration.
634 12th AvInner Richmondcomplete#Bathroom remodel#Plumbing
Dec 9, 2025
$40K
Convert ground floor rear storage area to bedroom, add eero compliant window. establish compliance for rescue per eg-02. construct new, interior partion wall to separate garage from habitable spaces. document as-built bathroom configuration.
634 12th AvInner Richmondcomplete
Dec 4, 2025
$100K
1)add restroom of main level. 2) add 2 bed and 2 bathroom on lower level.
215 Thornton AvBayview Hunters Pointissued#Bathroom remodel
Sep 4, 2025
No cost listed
Remodeling existing bathroo, remove and install bathtub and plumbing fixtures.
309 C Steiner StHaight Ashburycomplete#Plumbing
Sep 4, 2025
No cost listed
Remodeling bathroom, install new lights, outlets and heat flooring. 2 lights, 2 switches, 2 receptacles, 1 fan.
309 C Steiner StHaight Ashburycomplete#Electrical
Sep 2, 2025
$27.4K
Unit #c: in kind bathroom remodel: bath tub and plumbing, fixture and floor tile.
309 C Steiner StHaight Ashburycomplete#Bathroom remodel#Plumbing
Feb 20, 2025
No cost listed
In kind bathroom remodel w/ shower pan , replacing plumbing fixtures, and toilet
109 22nd AvOuter Richmondcomplete#Bathroom remodel#Plumbing
Feb 20, 2025
No cost listed
Replacing lights, floor heating, outlets and switches. pa#2025-0220-0710
109 22nd AvOuter Richmondcomplete#Electrical
Feb 20, 2025
$20K
In kind bathroom remodel, shower stall, toilet, vanity & mirrors. plumbing fixtures, heated flooring, towel bar, lighting tiling & painting
109 22nd AvOuter Richmondcomplete#Bathroom remodel#Plumbing
Feb 5, 2025
No cost listed
Mechanical hvac install coolant lines at the new furnace for potential future air conditioner installation.
42 August AlChinatowncomplete#Heating & cooling
Sep 27, 2024
$1K
Revision to conc. of plans 1/s3 details a & f of sheet a4 of permit #202404119791; this revision is a result of adjacent neighboring footing verified to be lower than originally expected (note on original sheet s3 for exploratory work)
42 August AlChinatowncomplete
Sep 23, 2024
No cost listed
Relocation of plumbing drain pipes and water heater as needed to abate nov #202312969 and bathroom and kitchen
42 August AlChinatowncomplete#Bathroom remodel#Plumbing#Water heater
Sep 23, 2024
No cost listed
Relocate electrical circuits to abate nov #202312969. construction of lower floor rear of building being the garage converting of extg mech room and portion of the garage to habitable space with 3 4th bathrooms. 8 lights, 4 switches, 1 fan, 1 d.w., 1 g. dis., and 3 smoke detectors.
42 August AlChinatowncomplete#Electrical
Apr 11, 2024
$120K
To abate nov 202312969 - construction of lower floor rear of building behind the (e) garage. convert 450sf of non conditioned space to conditioned consisting of (e) mech room and a portion of the garage to a habitable space w/ 3/4 bathroom.
42 August AlChinatowncomplete#Bathroom remodel#Garage & driveway