140 permits on record. Values are declared at filing.
Jul 10, 2026
No cost listed
Work category: 2pa; backflow for upgraded domestic water line
1950 Jackson StPacific Heightscomplete#Plumbing
Jun 4, 2026
No cost listed
Work category: 2pb; installing a 1-inch water service line from the back of the sidewalk to the existing connection that feeds the building.
451 Galvez AvBayview Hunters Pointcomplete#Plumbing
May 12, 2026
No cost listed
Work category: 3pa; subgrade drainage, area drainage, storm and sewer laterals, storm branches, sand intercepted/catch basin.
1950 Jackson StPacific Heightscomplete#Plumbing
Jul 7, 2025
No cost listed
Work category: 2pb; upgrade existing domestic water and install new fire service line
1950 Jackson StPacific Heightscomplete#Plumbing
Oct 2, 2024
No cost listed
Work category: 2pb; installation of 6" and 8" storm drainage line around future building and installation of cleanouts and area drains.
55 Bruton StTreasure Islandcomplete#Plumbing
Sep 23, 2024
No cost listed
Work category: 2pb; replace at the sample location from front yard to clean out with upsizing existing sewer lateral new pipe is hdpe
1950 Jackson StPacific Heightscomplete#Plumbing
Jun 28, 2024
No cost listed
Work category: 2pb; installation of storm drawing system for playground area. includes underground 4" pipe installation (solid and perforated), cleanouts, area drains and one sand trap
755 Ashbury StHaight Ashburycomplete#Plumbing
Jun 14, 2024
No cost listed
Work category: 3pb; this is for inspection on the front of property sidewalk and street. installing a combined storm/sewer line from the main to the curb. in the curb the line splits into (2) lines: one 8 inch storm drain and other 8 inch sewer. both lines will have a p-trap each and continue to building wall.
1750 Van Ness AvNob Hillcomplete#Plumbing
Jan 25, 2024
No cost listed
Renewal for pw20211007460: same work scope: work category: 3pb; underground utilities only - sewer install - 545 lf of 8" ss, 80 lf of 6" ss, 130' lfc of 4" ss, (4) 48" ss mh's and (9) ss co's. storm drain install - 160 lf of 18" sd, 540 lf of 12" sd, 320 lf of 6" sd, 1375 lf of 6" sd, 325 lf of 4" sd, (11) sd mh's, (17) cb's, (19) co's and (48) area drains. water install - 650 lf of 8" w, 160 lf of 6" w, 345 lf of 3" w, (3) 8" gv's, (1) 8" bfp and (1) 6" bfp. fire water install - 30 lf of 6" fw
299 Macalla RdTreasure Islandcomplete#Plumbing
Oct 25, 2023
No cost listed
To obtain final inspection for work approved under bpa#2018-0406-5667 all work is complete
10 Guy PlFinancial District/South Beachcomplete
Oct 12, 2023
No cost listed
Yerba buena island project - parcel 4y: an 8-inch reduce pressure principal, assembly (ref bpa# 202102225094)
201 Forest RdTreasure Islandissued#Fire sprinklers & alarms
Aug 8, 2023
No cost listed
Work category: 2pb; installing underground 8" hdpe sewer lateral to building connection.
77 Bruton StTreasure Islandcomplete#Plumbing
Jul 31, 2023
$129.6K
Install (2) private fire hydrants, yerba buena island project - parcel 4y & underground fire service
36 Meadow DrTreasure Islandcomplete
Jul 31, 2023
$25.8K
Install 3 private fire hydrants-yerba buena island project -parcel 4y: & under ground fire service, from 12" yb rd water main to point of connection
35 Meadow DrTreasure Islandissued#Fire sprinklers & alarms
Jul 20, 2023
No cost listed
Revision to pa# 202305107513 (bldg 26),ybi project-parcel 4y, replacement of approved backflow preventer febco lf876v to watts lf757 with cut sheets included.
38 Meadow DrTreasure Islandissued#Fire sprinklers & alarms#Plumbing
Jul 20, 2023
No cost listed
Revision to pa# 202305107512 (bldg 23),ybi project-parcel 4y, replacement of approved backflow preventer febco lf876v to watts lf757 with cut sheets included.
37 Meadow DrTreasure Islandissued#Fire sprinklers & alarms#Plumbing
Jul 20, 2023
No cost listed
Revision to pa# 202305107510 (bldg 21),ybi project-parcel 4y, replacement of approved backflow preventer febco lf876v to watts lf757 with cut sheets included.
35 Meadow DrTreasure Islandissued#Fire sprinklers & alarms#Plumbing
May 12, 2023
No cost listed
Work category: 5p; the existing storm drain later has been found to have two house traps. the plumbing inspector has noted this is not acceptable. one of them will need to be removed.
48 Stockton StFinancial District/South Beachcomplete#Plumbing
May 10, 2023
$34.8K
Underground fire service - yerba buena island project - parcel 4y: pa#: 201905170931 (bldg 23)
37 Meadow DrTreasure Islandissued
May 10, 2023
$79.2K
Underground fire service - yerba buena island project - parcel 4y: pa#: 201905170934 (bldg 26)