Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$55.9K
Most recent job
8.2y ago
Aug 21, 2018
9 permits on record. Values are declared at filing.
Aug 21, 2018
No cost listed
Remodel of two bathroom(s), one kitchen, and one laundry closet. replacemnet of water heater with a new 50 gal water heater. replacement of existing gas line in kind.
427 Harkness AvVisitacion Valleycomplete#Bathroom remodel#Plumbing#Water heater
Aug 21, 2018
No cost listed
Remodel of 1 kitchen, 3 bathrooms, 1 laundry closet. 40 lt,s 8 switches, 6 recepts, 1 gar disp, 3 fans, 1 dishwashers
30 Gilroy StBayview Hunters Pointcomplete#Electrical
Aug 21, 2018
No cost listed
Furnace replacement
30 Gilroy StBayview Hunters Pointexpired#Heating & cooling
Aug 21, 2018
No cost listed
Remodel of 1 kitchen, 3 bathrooms, 1 laundry closet, replace water heater
30 Gilroy StBayview Hunters Pointcomplete#Bathroom remodel#Water heater
Apr 25, 2018
$65.8K
Interior remodel; installation of new light fixtures on both floor levels, replacement of all bathroom/kitchen plumbing fixtures, this project will be performed within the foot print of the bldg. (single family dwelling)
30 Gilroy StBayview Hunters Pointcomplete#Kitchen remodel#Bathroom remodel#Plumbing
Mar 19, 2018
No cost listed
Installation of 35 recessed lights and 7 gfci outlets. 37 lights, 7 swtiches, 6 receptacles, 2 fans, 1 dishwasher, 1 garbage disposals
427 Harkness AvVisitacion Valleycomplete#Electrical
Mar 19, 2018
No cost listed
Installation of new furnace to replace extg furnace
427 Harkness AvVisitacion Valleycomplete#Heating & cooling
Mar 19, 2018
No cost listed
Installation of tankless water heater
427 Harkness AvVisitacion Valleyexpired#Water heater
Jan 24, 2018
$46K
Scope of work involves remodel of 2 existing bathrooms and 1 kitchen within the footprint of e building. work includes installation of recessed lights, replacement furnace, new tankless water heater. no wall changes
427 Harkness AvVisitacion Valleycomplete#Kitchen remodel#Bathroom remodel#Water heater#Heating & cooling