Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$4M
Most recent job
5.9y ago
Dec 8, 2020
5 permits on record. Values are declared at filing.
Dec 8, 2020
No cost listed
Request to shift fire hydrant #1 north approx. 50 feet and tie in at same location as fh #2. request to shift fh #3 east approx. 37 feet. no change to size of hydrants. hydrants within 100" of approved fdcs. original locations of hydrants approved in dbi building app. 20201-0116-2041. also reference
1001 Potrero AvMissionissued#Fire sprinklers & alarms
Sep 16, 2020
No cost listed
Revision to pa#202001162041 - shifted vermont street stairs and vehicle ramp in the northeast corner of the project west approximately 2 feet. removed two parking spaces on vermont street for increased visibility. minor revisions to underground site electrical and plumbing
1001 Potrero AvMissioncomplete
Jul 2, 2020
No cost listed
3 sewer tie-ins and manhole installation to the 18" cs sewer line running n-s under the private drop off, storm drain sewer tie-in to a private sewer line north of the project. 2 low pressure fire hydrant installations on private property. 1" irrigation line, wm, and bfp. 4" domestic line, wm, and bfp. 6" fire water line and bfp. all tying into vermont street that will terminate 5' from future building footprint.
1001 Potrero AvMissioncomplete#Plumbing
Jun 26, 2020
No cost listed
Building 7: safe-off existing electrical and low voltage systems interfering with new building construction. provide 3-new pull boxes for 12-kv electrical and communication service connections, retrofit 8-existing light fixtures with led heads, relocate 2-existing light fixtures, disconnect & provide 2-os&y tamper valves to relocated back flow preventer, provide temporary power connection to existing dph service
1001 Potrero AvMissionexpired#Electrical
Jan 16, 2020
$4M
Special project for partial replacement of existing surface parking lot, relocate & remove existing utilities, utitlities wil be installed to support future bldg, north side of project wil have parking reconfigured and new private roadway and ramp existing onto vermont street.
1001 Potrero AvMissioncomplete