Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$15.5K
Most recent job
7.1y ago
Sep 12, 2019
20 permits on record. Values are declared at filing.
Sep 12, 2019
$50M
Mayor dir# 17-02. 100% affordable housing. to erect 5 stories, no basement, type iii-a over type i-a, 76 units residential with mixed used buidling. (r-2,b,a-3) apn# 4624/033 (hunters view phase 3-block 17, lot 4)
1151 Fairfax AvBayview Hunters Pointcomplete#New construction
Sep 5, 2019
$500
Revision to 201602179822 modifications requested by mod. removal of bab-changing stations in community rm restrooms, addition of braille & raised letter exit routes. modifications to lift fixed approach ramp, addition of power assist to stair door
222 Taylor StTenderloincomplete
Jul 10, 2019
No cost listed
Rev to pa# 201602179822; to remove rooftop planters revised by erlier revision to this permit (201903014204)
222 Taylor StTenderloincomplete
Jul 10, 2019
$5K
Rev to pa 201602179822-s2; removal of bathroom at unit 152 and construction of shower room
222 Taylor StTenderloincomplete#Bathroom remodel
Jun 7, 2019
$5K
To erect indirect illuminated retail entrance sign (dalda community market)
222 Taylor StTenderloinissued
Apr 30, 2019
$5K
Revisions to handrails + gates at maintenance room and roof to m.o.d requirements. rev to barn door and gate hardware to m.o.d requirements. ref. 201602179822 s2
210 Taylor StTenderloinissued
Mar 1, 2019
No cost listed
Revision to pa 2016-0217-9822s2 and 2019-0102-9503 including addition of roof farm and revised pavig to roof level, revised community kitchen configuration, and landscape details including tree pit surrounds and turf specification
210 Taylor StTenderloincomplete
Jan 2, 2019
$35K
Mod project, priority processing. revision to permit #201602179822s2, addition of wheelchair lift & accessible floor with added signage, minor electric changes, landscapint and mep approved amendments.
210 Taylor StTenderloincomplete
Nov 5, 2018
$16K
Rev to pa# 201602179822 s2; to include smoke detector at elevator shaft, fire protection to recessed wall fixtures addition of errcs room & rotted shaft, locations of 2-way comms, added door to stair 1, accelographs added
210 Taylor StTenderloincomplete
Oct 22, 2018
$40M
Priority processing.to erect 6 stories, no basement, type i-a & iii-a. 105 units apartment, office, parking, amenity spaces buidling (r-2,b,a-3,s-2). (mayor executive directive 17-02) 100% affordable housing project. maceo may apts project.
1 Avenue Of The PalmsTreasure Islandcomplete#New construction
Jul 16, 2018
No cost listed
Weiss-ishai/sffd requested to submit addendum 4 drawing as a separate perit since the approved addendum 4 was not routed to sffd. reference permit 2016-0-06-6751. this separate permit is only for sffd review & routed to weissishai/sffd.
455 Fell StHayes Valleyissued#Fire sprinklers & alarms
Jul 10, 2018
No cost listed
Revision to 201605066751 s2 - metal stairs, structural maher na
455 Fell StHayes Valleycomplete
Jul 2, 2018
No cost listed
Revision to permit (201605066751 s2) structural wood framing, top lappng revision. maher n/a
455 Fell StHayes Valleycomplete
Jun 15, 2018
$200K
Install exterior pad mounted transformer. remove (e) transformer from (e) basement. provide blast walls on two sides of transformer per sffd request. (stumpp) reference p.a. # 2013 1106 1273
580 Capp StMissioncomplete
Sep 27, 2017
No cost listed
Adimistrative revision to site permit app# 201406249199, revise building height, levels, of occupancy & number of units to comply to approved site permit
255 Fremont StFinancial District/South Beachcomplete
Aug 14, 2017
No cost listed
Fire pump anchorage structural review deferred from 2014-0624-9199/s3 fire protection
255 Fremont StFinancial District/South Beachissued
Aug 10, 2017
No cost listed
Revision to foundation as previously approved in pa# 2016/02/17/9822-s1.
210 Taylor StTenderloincomplete#Foundation
Feb 10, 2017
$1K
Roof: revision to 2013-1120-2410 "s" - elevator hoisting smoke detector detail to match what was already on the issued addendum 3 (arch/mep) maher na
923 Folsom StSouth of Marketcomplete#Fire sprinklers & alarms
Nov 4, 2016
$15K
Provide a temporary leasing office at the ground floor commercial suite; work is limited to minor electrical & mechanical modifications (ref 2013-1120-2410s)
923 Folsom StSouth of Marketcomplete
Nov 4, 2016
$250K
Modification to building amenity spaces which include arch / mep revision. level b1: bike stg area changed to a fitness rm / bike stg rm to include workspace & wash area for bike equipment & dogs. level 1: core & shaft revision to accomodate new mep. level 2: revised casework, duct revisions, doors
923 Folsom StSouth of Marketcomplete#Heating & cooling