Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
7mo ago
Mar 11, 2026
10 permits on record. Values are declared at filing.
Mar 11, 2026
No cost listed
Quarterly permit: installed multiple circuits - dedicated/common convienance outlet system throughout the aq b1 back of house and front of house areas.
55 Music Concourse DrGolden Gate Parkissued#Electrical
Mar 4, 2026
No cost listed
This permit is for a temporary traveling show, this will require temp power fed from a distro powered unit that will feed a/v equipment and lighting systems. this will also require data and dmx signal
55 Music Concourse DrGolden Gate Parkcomplete#Electrical
Mar 18, 2019
No cost listed
This is for a temporary interactive exhibit - 6 week duration providing power to a 15 hp air compressor @ 480v 3phase, with a 50 amp fusible disconnect providing 30 - 120 v, 20 amp gfci protected circuited cord cap points of connections
55 Music Concourse DrGolden Gate Parkcomplete#Electrical
Feb 12, 2019
No cost listed
Installing convenience circuits / outlets for a photo desk and retail store
55 Music Concourse DrGolden Gate Parkcomplete#Electrical
Nov 7, 2018
No cost listed
Cas east garden temporary ice rink exhibit - electrical 30 - 120v, 20 amp gfci protected convenience outlets 1 - 480 volt 600 amp 3 phase, 4 wire, with grounding conductors - to feed a 230 ton chiller unit and connected to cas existing company switch source
55 Music Concourse DrGolden Gate Parkcomplete#Electrical
Apr 19, 2018
No cost listed
This is a museum exhibit hall that will require power/data for audio/visual equipment, lighting - communication and signal
55 Music Concourse DrGolden Gate Parkcomplete#Electrical
Nov 2, 2017
No cost listed
Electrical installation for two fan coil units @ 3 phase 480 volts 20 amp 4 wire. each unit will have a combination starter / disconnect. each unit requires 2 - 120 volt 20 amp control circuits.
55 Music Concourse DrGolden Gate Parkcomplete#Electrical
Nov 2, 2017
No cost listed
Running temporary power 480 volt 3 phase with ground that has a 500 amp trip, parallel 350 mcm per phase and one 350 mcm for ground from identified company switch to ice rink chiller unit. total length 120 feet. also two spider box connected units for utility power use.
55 Music Concourse DrGolden Gate Parkcomplete#Electrical
May 5, 2017
No cost listed
Academy of sciences - auditorium temporary exhibit - electrical installation provided extension cords with male/female caps, including quad outlet boxes that extend from existing building outlets to point of connections specific to exhibit lighting and audio visual equipment. all lighting has a controlled programming on/off time.
55 Music Concourse DrGolden Gate Parkexpired#Electrical
Dec 14, 2016
No cost listed
General electrical done throughout the facility
55 Music Concourse DrGolden Gate Parkcomplete#Electrical