Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$90K
Most recent job
5.8y ago
Dec 18, 2020
22 permits on record. Values are declared at filing.
Dec 18, 2020
No cost listed
To renew building permit application no(s)201108243104. demolish and remove existing wood form work/shoring @ north end of building, adjacent to 15 guy place, in order to comply with notice of violation # 200926808 and 201190414. all work complete.
50 Lansing StFinancial District/South Beachissued
Nov 13, 2019
No cost listed
Revision pa# 2016-0725-3262s: modify a guardrail detail relating to a specific guardrail at the bridge seismic joint. this affects a total of 28 guardrail extensions
1532 Harrison StMissioncomplete#Seismic retrofit#Decks & stairs
Jul 16, 2019
No cost listed
Revision to s2 (arch/mep) of pa #2016-0725-3262 s. change roof deck occupancy from a-3 to r-2 accessory.
1532 Harrison StMissionwithdrawn#Decks & stairs
Jun 24, 2019
$18.5K
Revision to s3(stromwater) for pa 2016-07-25-3262s. adjust the sewer piping to meet all the inverts at the street. maher exempted-approval from dph attached.
1532 Harrison StMissioncomplete#Plumbing
Nov 16, 2018
No cost listed
Revision to appln #201803194005. increase depth of shoring.
2153 15th StCastro/Upper Marketcomplete
Nov 16, 2018
No cost listed
Shoring revision to appln #201803194008
2163 15th StCastro/Upper Marketcomplete
Aug 31, 2018
$10K
Revision to pa 2016-0725-3262 s1 for 10x10 slab opening at garden level reinforced concrete slab for tower crane ** maher: exempted - see attached approval from dph **
1532 Harrison StMissioncomplete
May 16, 2018
$8.1K
Tower crane foundation for new construction. ref pa# 2016/07/25/3262-s. ** maher: exempted - approval from dph attached. **
1532 Harrison StMissioncomplete#Foundation#New construction
Mar 19, 2018
$250K
Temporary shoring system to accommodate foundation construction for pa 2017-0331-2940, 2240 market st
2163 15th StCastro/Upper Marketcomplete#Foundation
Mar 19, 2018
$250K
Temporary shoring system to accommodate foundation construction for pa 2017-0331-2940, 2240 market st
2153 15th StCastro/Upper Marketcomplete#Foundation
Oct 11, 2017
$90K
Tower crane foundation permit
302 Silver AvExcelsiorcomplete#Foundation
Sep 11, 2017
$1K
Addition of the mechanical fire/smoke alarm operation matrix to the mechanical drawing. ref pa 2014-0505-4911 s2
815 Tennessee StPotrero Hillcomplete
Aug 21, 2017
No cost listed
New build. 68 shower pans
815 Tennessee StPotrero Hillexpired#Bathroom remodel#Plumbing
Jul 28, 2017
$5K
To further comply with correction notice & report #2 dated 6/29/2017 rev. to s2 (arch/mep) new bldg pa#201405054911: add draft stop in joist space on sheet a9.00 detail 3. n/a ordinance #155-13
815 Tennessee StPotrero Hillcomplete
Jul 26, 2017
No cost listed
Comply with notice and report 2 dated 6/29/17. revision to s2 arch/mep ref 201405054911, clarify drywall installtion sheet a1.10.01 to match drywall installation on sheet a9 per field ins req
815 Tennessee StPotrero Hillcomplete
Jul 26, 2017
No cost listed
1 shower pan
815 Tennessee StPotrero Hillexpired#Bathroom remodel#Plumbing
Jun 7, 2017
No cost listed
To comply w/correction notice & report #1 dated 5/25/17. additional fire proofing details to the previously approved #201705307838. these details are for the structural beams & columns in the 1st fl plate w/2 conditions: beams in a wall & beams in a ceiling assembly
815 Tennessee StPotrero Hillcomplete
Jun 2, 2017
$600K
Demolition of on site parking lot, installation of steel soldier beams of shoring to allow for excavation of future basement. excavation of basement to a depth of approx 22 ft. below current grade. finish grading of basement excalvation for future concrete installation. maher exempt.
1532 Harrison StMissioncomplete#Demolition & abatement
Jun 2, 2017
$900K
Shoring & tieback for new construction at 1532 harrison st p/a#201607253262-s. maher exempt.
1532 Harrison StMissioncomplete#New construction
May 30, 2017
$10K
To comply with correction notice & report #1 dated 5/25/17. revision to s2 (arch/mep) ref pa 2014-0505-4911. amended details 2 & 3 on sheet a9.20 to show fire proofing method on frame beams & posts
815 Tennessee StPotrero Hillcomplete