Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$138K
Most recent job
4mo ago
Jun 11, 2026
23 permits on record. Values are declared at filing.
Jun 11, 2026
$30K
3rd floor: replace existing solarium style shower, in kind. waterproofing, repair to deck and roof areas and 2nd floor ceiling due to leaks.
3150 Pacific AvPresidioissued#Bathroom remodel#Decks & stairs
Jan 6, 2023
No cost listed
Revision to bpa#202110221029 to unit #4: omission of floor opening @ showers, concrete wall openings @ north wall of dining room, fake fireplace in study, addition of repair details for unseen conditions
1940 BroadwayPacific Heightscomplete
Oct 14, 2022
No cost listed
Revision 201804136335 s3 to document the revised area with the mechanical room at roof level
145 Leavenworth StTenderloincomplete
Mar 31, 2022
No cost listed
Revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.
145 Leavenworth StTenderloincomplete
Mar 31, 2022
No cost listed
Revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.
361 Turk StTenderloincomplete
Jul 23, 2021
No cost listed
Revision to pa#202106011408: protion of bldg storm water is directed to flow-thru bio-retention planter that is located below the sewer lvl. storm sump is located on the basement lvl to collect&lift the storm water to gravity flow storm drain. 3way failsafe valves are utilized to re-direct stormwate
361 Turk StTenderloinissued
Jun 1, 2021
$10K
Plumbing only: stormwater system permit for future construction of building at 361 turk street under pa# 201804136327.
361 Turk StTenderloinissued#Plumbing
May 12, 2021
$10K
Stormwater systempermit for future construction of building at 145 leavenworth under pa #201804136335-s
145 Leavenworth StTenderloincomplete
Oct 16, 2020
No cost listed
Mayor dir 17-02. revision to pa #201804136335s1, changes include: ground floor load map updated to arch plans, shift shear walls as needed. update elevator shaft dimensions.
145 Leavenworth StTenderloincomplete
Sep 23, 2020
$176K
Mayor dir# 17-02. rev to pa# 201804136335-s9. 46 ri columns were added in vicenity of tower crane. these ri's are shown in plan review on attached & also highlighted in ri column section. dimension of added "c" type ri's are same as "a" type ri's but they are on a 4' spacing instead of 8'spacing.
145 Leavenworth StTenderloincomplete
Sep 14, 2020
$35K
Interior remodel of common corridors include new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint). and replacing existing light fixtures wiht new low energy light fixtures. new led lighting at select locations.
154 Lombard StFinancial District/South Beachcomplete
Aug 26, 2020
$20K
Mayor dir# 17-02. rev to pa# 201804136327-s2. level 2 re-designed to incorporated new skylight @ courtyard. minor updated to level a code formed steel stud framing; dimensions clarified & details cleaned up & vertical stiffeners removed from details 14 + 15/s4.64. no changes made to lateral system.
361 Turk StTenderloincomplete#Windows#Plumbing
Feb 7, 2020
$100K
Revision to pa 2019-0726-7068 and 2019-0919-2189 add cap beams along turk street side. add soldier beams for future tower crane elevator pit and lagging along north wall. update details and minesions per field conditions
361 Turk StTenderloincomplete
Jan 9, 2020
$180K
Tower crane foundation and erect tower crane
361 Turk StTenderloincomplete#Foundation
Dec 20, 2019
$5K
Revision to pa# 2015-1009-9357: addition of a 60-minute fire rated parapet to an existing roof.
2620 Buchanan StPacific Heightsissued
Jul 8, 2019
No cost listed
As per planning confirmation of demo calculations only for 2018015629enf & 2019012759enf. revision to 201107079682, 201711073406, 201803093281, 201901241098, 201905312200.
595 Clipper StNoe Valleycomplete#Demolition & abatement
May 31, 2019
$250.5K
Excavation of (e) soil to sub-grade to prepare for (n) construction
145 Leavenworth StTenderloinwithdrawn
May 31, 2019
$300K
Excavation of (e) soil to allow for (n) building construction
361 Turk StTenderloinwithdrawn
Jan 29, 2019
No cost listed
Install 7 shower pans.
2620 Buchanan StPacific Heightscomplete#Bathroom remodel#Plumbing
Oct 29, 2018
$65M
To erect 13 stories, 1 basement, type 1a mixed-use bldg w/ church, retail and 176 dwelling units**comply w/ maher ord 155-13, route to health** cfc shall not be issued before the completion of lots merger.1st addendum shall not be issued prior to written puc approval of stormwater control plan.
474 Ofarrell StTenderloinissued#New construction