Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
2mo ago
Jul 27, 2026
3 permits on record. Values are declared at filing.
Jul 27, 2026
No cost listed
Install (1) level 2 ev charger (tesla wall connector, 40a, 240v, 9.6kw) at parking stall #73 in common garage, serving unit 4111. load-side feeder tap per cec 240.21(b)(1) at unit's (e) 100a main breaker at meter #1009530643, (n) 60a/2p disconnect, (n) 50a/2p branch breaker, (2) #6 cu thhn + (1) #10 cu egc in 3/4" emt, approx. 100 ft. load calc per cec 220.87. no service upgrade.
401 Crescent CtBayview Hunters Pointissued#Electrical#EV charger
Jun 18, 2026
No cost listed
Install level 2 ev charger (tesla wall connector) in underground parking garage of residential condominium. run new dedicated 240v circuit from existing electrical meter to designated parking space #147. includes emt conduit, thhn conductors, 60a disconnect with 50a breaker, and evse mounting. no service upgrade.
301 Crescent WyBayview Hunters Pointissued#Electrical#EV charger
Mar 31, 2026
No cost listed
Install level 2 ev charger (tesla universal wall connector) in underground parking garage of residential condominium. run new dedicated 240v circuit from existing electrical panel on parking garage floor to designated parking space. includes emt conduit, thhn conductors, 60a breaker, and evse mounting. no service upgrade.
401 Crescent WyBayview Hunters Pointissued#Electrical#EV charger