16 permits on record. Values are declared at filing.
Feb 1, 2024
No cost listed
Upgrade of existing emergency system to a type 1 system.
2299 St Post StJapantowncomplete#Electrical
Sep 14, 2021
No cost listed
Furnish and install a sub panel and a 15kva ups and feed receptacles.
450 St Sutter StFinancial District/South Beachcomplete#Electrical
Oct 30, 2020
No cost listed
Safe-off and demo elect & lv sys & reconnect elect and ltg circuits that interfear with new bldg const. provide 3-new vaults for 12kv elect& for commservice to new building, retrofit 8-exist light fixtures with led heads and replace exist raceway and wire with new, disconnect & provide 2-os&y tamper valve connections to relocated back flow preventer, and provide temporary power for construction of new bldg
1001 Av Potrero AvMissioncomplete#Electrical
Jun 28, 2019
No cost listed
Install a 120v duplex outlet, it will extend 24' from the (e). - suite 1060 it room replace a 120v suplex outlet with a 120v recessed clock style duplex outlet. - suite 1060 conference room
455 St Market StFinancial District/South Beachcomplete#Electrical
May 10, 2019
No cost listed
Installation of electrical, fire alarm, security and telecom for newly constructed 12 story mixed use building.
200 Av Van Ness AvTenderloincomplete#Electrical
Jan 1, 2019
No cost listed
Requesting temp power permit for grounding and switchboard inspections under existing use permit. will pull complete electrical permit once building permit is issued.
200 Av Van Ness AvTenderloincomplete#Electrical
Sep 4, 2018
No cost listed
Remodel existing hotel meeting rooms, ballrooms, and lobby to include replacing and adding new electrical devices, replacing data devices, and retrofitting and adding new light fixtures with modifications to lighting controls. protection and modifications to fire alarm devices is also included which will be covered in a separate fire alarm permit. work will be performed on b2, b1, 2nd, 4th, and 5th floors.
55 St 04th StFinancial District/South Beachcomplete#Electrical
Sep 4, 2018
No cost listed
Remodel existing hotel lobby to include replacing and adding new electrical devices, replacing data outlets, providing new and retrofitted fixtures with modifications to lighting controls. work to be performed at entry level lobby elevator vestibules
55 St 04th StFinancial District/South Beachcomplete#Electrical
Aug 10, 2018
No cost listed
Fee's for security devices inspected at 555 selby.
555 St Selby StBayview Hunters Pointcomplete#Electrical
Jul 26, 2018
No cost listed
Added security devices under existing electrical permit ew 201706226249
450 St Toland StBayview Hunters Pointcomplete#Electrical
Jun 22, 2017
No cost listed
New electrical systems for new structure
555 St Selby StBayview Hunters Pointcomplete#Electrical
Jun 22, 2017
No cost listed
New electrical systems for tenant improvement project
450 St Toland StBayview Hunters Pointcomplete#Electrical
Jun 13, 2017
No cost listed
Electrical plan review for main switch gear
701 St 03rd StMission Baycomplete#Electrical
Jun 1, 2017
No cost listed
Install temporary 400amp 3p 480v/277v n3r service for temp power to construction job site trailer and misc construction hand tools. to be removed after permanent power is installed.
555 St Selby StBayview Hunters Pointcomplete#Electrical
Mar 28, 2017
No cost listed
All new electrical for new construction of 11 story 230 unit hotel with one floor of commercial space, all electrical and life safety systems, fire alarm raceways, main power distribution, 2500amp service, low voltage data and communications.
701 St 03rd StMission Baycomplete#Electrical
Feb 20, 2017
No cost listed
Install 800a temp power for new construction.
701 St 03rd StMission Baycomplete#Electrical