Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$560K
Most recent job
3mo ago
Jul 1, 2026
27 permits on record. Values are declared at filing.
Jul 1, 2026
No cost listed
Deferred mep seismic bracing. ref permit 202509034495.
449 Avenue HTreasure Islandissued#Seismic retrofit
May 22, 2026
$419.8K
Revision to pa # 202509034495 for added exterior pool, shifted pathway, added bldg pad at nw corner, mech, & plaumbing, lighting & electrical revisions, reference delta 12 for revisions. reference folowing permit revisions for tracking: #202602045167 & 202603107301.
449 Avenue HTreasure Islandissued
Apr 8, 2026
No cost listed
Deferred glulam beam connections permit and superstructure revision. reference pa# 2025.0903.4495
449 Avenue HTreasure Islandissued
Mar 10, 2026
$10K
Revision 202509034495 for in ground spas. reference 202602045167 for foundation and pump room revisions. electrical deferred for separate submittal. no change in use or size. no exterior changes. revised occ. load of exterior courtyard.
449 Avenue HTreasure Islandissued#Foundation
Feb 5, 2026
No cost listed
Revision to ground improvement. ref pa #202510167538
449 Avenue HTreasure Islandcomplete
Feb 4, 2026
$10K
Revision to foundation for future spa ref pa # 2025-0903-4495. architectural & mep elements of spa will be submitted separately. add change of groundskeeping covered area to pump room.
449 Avenue HTreasure Islandissued#Foundation
Oct 16, 2025
$534K
Soil improvement. design build const of vibro displacement column (vdc) & 1 vibro compaction ground improvement. ground improvement only & exclude design & construction of foundation shoring. temporary construction pad grading & final pad grading. ref to grading pa# 202510066801
449 Avenue HTreasure Islandcomplete#Foundation
Oct 6, 2025
$560K
Treasure island. rough grading to excavate approx 20,000 cubic yard of soil & transport material to dumpsite @ 4th st/avenue h locate 1/4 mile se. depth of excavation varies from 0.1 to 5.7'. additionally 5,000 cubic yard of soil (depths rang from 0.1 to 5.6') will be placed as compact fill.
449 Avenue HTreasure Islandcomplete
Sep 18, 2025
$31.1M
**premium plan review**new construction of type ii-b (sprinklered), 1-story steel and mass timber structure to include training facility (locker room, weight training, athletic training, hydotherapy & offices). 2 parking areas and 3 full size pitches and outdoor multi-function training area.
449 Avenue HTreasure Islandreinstated#New construction
Apr 6, 2021
$9K
Demo exterior wall 5-6" none bearing wall. replace 5-6" of metal studs, re plaster (e) wall, install brick veneer. comply w/ bid nov# 202174751. no plans per bid/ces site visit.
1598 Bay StMarinacomplete#Demolition & abatement
Aug 13, 2020
No cost listed
(west building): revision to pa# 201611303820-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project.
2500 Turk BlLone Mountain/USFissued#Fire sprinklers & alarms
Aug 13, 2020
No cost listed
(east building): revision to pa# 201611303815-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project.
2500 Turk BlLone Mountain/USFcomplete#Fire sprinklers & alarms
Jun 22, 2018
$5M
Design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg)
2500 Turk BlLone Mountain/USFcomplete
Jun 22, 2018
$2M
Design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg)
2500 Turk BlLone Mountain/USFcomplete
May 24, 2018
No cost listed
Install (2) shower pans.
1598 Bay StMarinaexpired#Bathroom remodel#Plumbing
Apr 9, 2018
No cost listed
18 shower pans
1598 Bay StMarinacomplete#Bathroom remodel#Plumbing
Aug 29, 2017
No cost listed
Revision to structural and mounting details of previously approved sunshades and awnings under pa #201312234917 and #201701318334. maher na
1201 Tennessee StPotrero Hillcomplete#Fire sprinklers & alarms
Aug 29, 2017
No cost listed
Revision to app: #201312234917 s8. as built plans for distributed antenna system (das). maher na
1201 Tennessee StPotrero Hillcomplete#Fire sprinklers & alarms
Aug 14, 2017
No cost listed
Mechanical revisions to pa#201312234917 as built of fire smoke dampers. n/a ordinance #155-13
1201 Tennessee StPotrero Hillcomplete
Jun 30, 2017
No cost listed
Deferred submittal- metal stairs. shop drawings #2015-1223-5830
1598 Bay StMarinaissued