Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
1mo ago
Sep 8, 2026
418 permits on record. Values are declared at filing.
Sep 8, 2026
No cost listed
Work category: 1p; unit 4-1701 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
440 Davis CtFinancial District/South Beachissued#Bathroom remodel#Plumbing
Sep 8, 2026
No cost listed
Work category: 1p; unit 4-2015 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
440 Davis CtFinancial District/South Beachissued#Bathroom remodel#Plumbing
Sep 8, 2026
No cost listed
Work category: 1p; unit 4-0512 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
440 Davis CtFinancial District/South Beachissued#Bathroom remodel#Plumbing
Aug 25, 2026
No cost listed
Work category: 1p; unit 1-1809 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
550 Battery StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Aug 25, 2026
No cost listed
Work category: 1p; unit 1-1410 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
550 Battery StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Aug 25, 2026
No cost listed
Work category: 1p; unit 1-0713 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
550 Battery StFinancial District/South Beachissued#Bathroom remodel#Plumbing
Aug 25, 2026
No cost listed
Work category: 1p; unit 1-1018 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
550 Battery StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Aug 25, 2026
No cost listed
Work category: 1p; unit 1-0511 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
550 Battery StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Aug 13, 2026
No cost listed
Work category: 1p; unit 4-2211 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
440 Davis CtFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Aug 13, 2026
No cost listed
Work category: 1p; unit 2-1205 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
155 Jackson StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Aug 13, 2026
No cost listed
Work category: 1p; unit 1-0918 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
550 Battery StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Aug 13, 2026
No cost listed
Work category: 1p; unit 2-1501 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
155 Jackson StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Jul 16, 2026
No cost listed
Work category: 1p; unit 4-2212 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
440 Davis CtFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Jul 16, 2026
No cost listed
Work category: 1p; unit 3-1104 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
405 Davis CtFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Jul 16, 2026
No cost listed
Work category: 1p; unit 2-2102 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
155 Jackson StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Jun 30, 2026
No cost listed
Work category: 1p; unit 1-1017 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
550 Battery StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Jun 30, 2026
No cost listed
Work category: 1p; unit 3-1807 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
405 Davis CtFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Jun 30, 2026
No cost listed
Work category: 1p; unit 1-1515 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
550 Battery StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Jun 30, 2026
No cost listed
Work category: 1p; unit 4-1601 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
440 Davis CtFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Jun 29, 2026
No cost listed
Work category: 1p; unit 4-1410 remodel, change out angle stops and shower valves and installation of new pedestal lavatory sink, toilet, bathtub, and shower trim.
440 Davis CtFinancial District/South Beachcomplete#Bathroom remodel#Plumbing