Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$1.9M
Most recent job
6.8y ago
Jan 27, 2020
21 permits on record. Values are declared at filing.
Jan 27, 2020
No cost listed
Mb4: admin pa to memorialize installation req per ab-005 for framery phone booths as shown in ti permits for levels 3-11. l3-2019-0716-6063, l4-2019-0522-1411, l5-2019-0522-1416, l6-2018-1001-1925 & rev 2019-0402-6929, l8- 2019-0923-2389, l9-2019-0923-2383, l10-2019-0923-2384;l11-2019-0923-2386
300 16th StMission Bayissued
Dec 11, 2019
No cost listed
Install 2 shower pans for unit 434 & 526
135 Townsend StMission Baycomplete#Bathroom remodel#Plumbing
Sep 23, 2019
$2.1M
Mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.
300 16th StMission Baycomplete
Sep 23, 2019
$2.1M
Mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher
300 16th StMission Baycomplete
Sep 23, 2019
$2.3M
Mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
300 16th StMission Baycomplete
Sep 23, 2019
$2.2M
Mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher
300 16th StMission Baycomplete
Sep 23, 2019
$2.1M
Mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
300 16th StMission Baycomplete
Sep 23, 2019
$2.2M
Mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher
300 16th StMission Baycomplete
Sep 23, 2019
$2.2M
Mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
300 16th StMission Baycomplete
Apr 25, 2018
No cost listed
Revision to 201410209377s3 correct measurement and egress to match field conditions maher not req
100 Hooper StMission Baycomplete
Feb 5, 2018
No cost listed
Plumbing shower pan flood test 8 total
100 Hooper StMission Baycomplete#Bathroom remodel#Plumbing
Dec 12, 2017
$1.7M
18th fl - ti to existing officce floor. improves include (n) office, open office area and new restrooms. maher n/a
350 Bush StFinancial District/South Beachissued
Dec 11, 2017
$1.7M
19th fl - interior ti to existing office floor. improvements to include (n) offices, open office space, break area, and new restrooms. no structural work. maher n/a
350 Bush StFinancial District/South Beachcomplete
Oct 25, 2017
$1K
Ref 201410209377 s3, add outdoor rated access panel at elevator penthouse
100 Hooper StMission Baycomplete
Oct 25, 2017
$1K
Revision to 201410239755 s3 add outdoor rated access panel at elevator penthouse
150 Hooper StMission Baycomplete
Sep 8, 2017
No cost listed
Revision to new bldg. pa#201503050110-s3 for mechanical smoke control system documentation.
510 Townsend StSouth of Marketissued
Sep 5, 2017
No cost listed
Revision to 201410209377,s3 changes to doors and door schedules (interior)
100 Hooper StMission Baycomplete
Aug 18, 2017
$10K
Rev to superstructure addendum pa#201410239755-s2: changes to roof p1 slab for new mep equipment changes. changes to misc details. add elevator guardrail support & roof top davitts.
150 Hooper StMission Baycomplete#Decks & stairs
Aug 11, 2017
$298K
Revision to app#201410209377 s2. revise 4th floor - reinforce for 100# sq. foot live load in lieu of 80# per sq. foot. revise steel frame for penthouse at roof level. n/a maher
100 Hooper StMission Baycomplete
Aug 9, 2017
No cost listed
Installation of 14 shower pans at basement and 1st floor levels
510 Townsend StSouth of Marketcomplete#Bathroom remodel#Plumbing