Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$57.5K
Most recent job
3.4y ago
May 24, 2023
22 permits on record. Values are declared at filing.
May 24, 2023
$40K
Water damange restoration of interior to include kitchen renovation, replacement of engineering wood flooring, drywall patching at 2/f, drywall replacement on 1/f. repair in kind and kitchen remodel.
31 Walter StCastro/Upper Marketcomplete#Kitchen remodel
Jul 21, 2022
$25K
Demo (e) rear yard doors to be replaced w/ taller and winder doors. demo (e) side yard inoperable windows & replaced w/ (n) push out casement windows. minor inteiror remodel - walls.kitchen & bathrooms remodel under 202205114025.
2453 Filbert StMarinacomplete#Windows#Kitchen remodel#Bathroom remodel#Demolition & abatement
May 11, 2022
$65K
1st fl, one kitchen & one 1/2 bath (powder room) renovation. 2nd fl, two bathrooms renovation. non structural. all work in kind
2453 Filbert StMarinacomplete#Kitchen remodel#Bathroom remodel
Mar 22, 2022
No cost listed
To obtain final inspection for work approved under pa# 201311222611. all work is complete.
1506 Golden Gate AvWestern Additionissued
Mar 14, 2022
$50K
Kitchen remodel. dining room remodel - remove wall partition. master bathroom remodel. new exterior doors in family room.
530 Liberty StCastro/Upper Marketissued#Kitchen remodel#Bathroom remodel
Mar 4, 2022
No cost listed
To obtain a final inspection for work aprpoved under previous pa 201910225165. all work is complete.
265 Amber DrNoe Valleycomplete
Nov 9, 2021
$150K
Remodel of (e) sfd; no change to height or footprint. lower level: convert (e) bedroom & bath to 2br & bath & kitchenette. upper lee: rearrange 3 bedrooms & 2 baths. e.o plannning asked applicant to remove balcony for this review on 11/9/2021
79 Collins StPresidio Heightscomplete#Bathroom remodel#Decks & stairs
Nov 1, 2021
$2K
Demo of (e) finishes at walls, ceilings and stairs at lower level. first floor to verify substrate condition
79 Collins StPresidio Heightsissued#Demolition & abatement
Aug 25, 2020
$11K
Replace front windows with aluminium wood-clad: top level 6 windows, middle level 5 windows. max u factor 0.32 or better.
1980 Fell StLone Mountain/USFcomplete#Windows
Aug 25, 2020
$289K
No changes in use, area, footprint or height. remodel of 2 existing flats (kitchen, new bath & closets) includes new flooring, finishes, radiant heat, & replaced electrical panels, wiring & outlets thoughout. non-visible st window replacements & new skylights.electrical & hvac under separate pmw2024
1980 Fell StLone Mountain/USFcomplete#Windows#Kitchen remodel#Bathroom remodel#Heating & cooling
Oct 22, 2019
$75K
Voluntary structural strengthening, interior remodel of (e) kitchen and baths, replacement of windows in kind, roof replacement under separate permit
265 Amber DrNoe Valleyexpired#Windows#Kitchen remodel#Bathroom remodel
Jun 7, 2019
No cost listed
Revised site permit #201508275398. 3rd & 4th flrs vertical & horizontal addition. lower unit: rebuilt kitchen, and relocated & rebuild (1) bath, and interior remodel. upper unit: rebuilt kitchen, (1) relocate & rebuilt bath, (2) (n) full bath, (1) (n) 1/2 bath, and interior remodel.
276 Duncan StNoe Valleyissued#Kitchen remodel#Bathroom remodel#Additions & major remodels
May 29, 2019
$20K
Reivsions to pa 201812218992. relocate (e) kitchen & dining rooms, add (n) pocket doors between dining rm, (n) great rm nd (e) living room
2323 Lake StOuter Richmondissued#Kitchen remodel
Feb 8, 2019
$80K
Remodel existing kitchen and 2 baths. install new elec panel with new circuits. install new wall between bedrooms. new gas fireplace
2295 Vallejo StPacific Heightscomplete#Kitchen remodel#Bathroom remodel
Dec 21, 2018
$75K
3rd flr interior remodel. construct non load-bearing walls to remodel (4) bedrooms, 3 (e) bathrooms, closet & utility spaces and add 1 (n) powder room. ref demo pa 201812077823
2323 Lake StOuter Richmondissued#Bathroom remodel#Demolition & abatement
Dec 7, 2018
$4K
Remove (e) ceiling and wall finishes on 3rd fl. only in order to determine (e) structural conditons max 25% area, repair repair in-kind w/min 1-layer of typ "x" each side of wall ceiling if no furture work
2323 Lake StOuter Richmondcomplete
Sep 5, 2018
$1K
Exploratory demo on 2nd floor on facilitate. sound proofing work/investigation repair and restore after the demo
3248 Broderick StMarinaissued#Demolition & abatement
Aug 30, 2018
$65K
Comply with nov 201446482 unit 203 - remodel (e) kitchen & 2 bedrooms per plan; enlarge the (e) bathroom to master bathroom per plan; add (n) bathroom per plan; convert (e) closet w.i.c. per plan, create (n) den not to be used for sleeping purposes
795 Sutter StNob Hillcomplete#Kitchen remodel#Bathroom remodel
Mar 17, 2017
$190K
Front building - interior renovation of (e) structure, including finishes, plumbing, electrical, mech systems. work to exterior include replacment of steel windows in-kind an upgrade to weather barrier as req. (e) kitchen on upper level to be remodeled, 2(e) bathrooms on lower level to be remodeled.
1361 Filbert StRussian Hillcomplete#Windows#Kitchen remodel#Bathroom remodel#Plumbing
Dec 20, 2016
$8.5K
Generally includes the expanson of an existing roof deck.
840 Union StRussian Hillissued#Decks & stairs