Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
2.6y ago
Mar 13, 2024
1 permits on record. Values are declared at filing.
Mar 13, 2024
No cost listed
Sfpuc skyline bl ridge trail project: install temp pole and temp panelboard to temp power field office units. area for the office unit will be in an open staging area for a trail building project near the sr-92/sr-35 (skyline bl) intersection on skyline blvd. 6x6in pole, (2) 8ft ground rods, 2- 2pole 100a breakers,1-2pole 50a breakers, #2/#6 wire. 200a -120/240v,1p meter panelboard nema 3r
999 Unknowncomplete#Electrical