Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$27.5K
Most recent job
29d ago
Sep 18, 2026
111 permits on record. Values are declared at filing.
Sep 18, 2026
$40K
Solar permit: mounted: roof, ballasted: n, including 2 energy storage unit, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | install (2) tesla powerwall 3 energy storage systems, one connected to each existing 200a main electrical panel. install
572 Hill StNoe Valleytriage#Solar & batteries#Electrical
Sep 18, 2026
No cost listed
Pv solar plan #6981, 24 pv modules, 410 watts per module, 9.84 (dc)kw, batteries, new subpanel. please notify district fire inspector at the start of work 415-554-8932.
583 Dolores StMissionissued#Electrical#Solar & batteries
Jul 29, 2026
No cost listed
New lights and outlets and a 320amp service upgrade
223 Spruce StPresidio Heightsissued#Electrical
Jul 15, 2026
No cost listed
Adding outlets and lights to existing electrical system
2500 Steiner StPacific Heightsissued#Electrical
Jul 14, 2026
No cost listed
Installation of level 2 ev charger.
149 Dalewood WyWest of Twin Peaksissued#EV charger
Jul 9, 2026
No cost listed
Installation of level 2 ev charger w/ load management device.
1963 McAllister StLone Mountain/USFcomplete#EV charger
Jul 9, 2026
No cost listed
200amp main panel upgrade
1031 Key AvBayview Hunters Pointissued#Electrical
Jun 29, 2026
No cost listed
Installation of a level 2 ev charger and load management device.
1675 42nd AvSunset/Parksideissued#EV charger
Jun 29, 2026
No cost listed
New electrical wiring, outlets, lighting, and upgrade to 400a service
2536 Baker StPacific Heightsissued#Electrical
Jun 22, 2026
No cost listed
Installation of a level 2 ev charger
3622 Sacramento StPresidio Heightsissued#EV charger
Jun 16, 2026
No cost listed
Installation of a level 2 ev charger
66 Ellsworth StBernal Heightscomplete#EV charger
Jun 15, 2026
No cost listed
Installation of level 2 ev charger in attached garage.
2838 Folsom StMissionissued#EV charger
Jun 15, 2026
No cost listed
Installation of a level 2 ev charger
814 29th AvOuter Richmondcomplete#EV charger
Jun 10, 2026
No cost listed
Installation of a level 2 ev charger
37 Linda StMissionissued#EV charger
Jun 10, 2026
No cost listed
Installation of level 2 ev charger.
2160 Hayes StLone Mountain/USFissued#EV charger
Jun 8, 2026
No cost listed
Installation of level 2 ev charger in garage.
234 Downey StHaight Ashburycomplete#EV charger
Jun 3, 2026
No cost listed
Installation of level 2 ev charger.
531 12th AvInner Richmondissued#EV charger
Jun 3, 2026
No cost listed
Installation of level 2 ev charger in attached garage.
57 Panorama DrTwin Peakscomplete#EV charger
Jun 1, 2026
No cost listed
Installation of level 2 ev charger with load management device.
1246 Church StNoe Valleycomplete#EV charger
May 28, 2026
No cost listed
Units 1 and 3: to comply with nov 202656849: install 2 level 2 ev changers with load maangement devices in common garage area. ok per cheryl rose to get only 1 permit.
75 Roosevelt WyCastro/Upper Marketcomplete#Electrical