Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$182.5K
Most recent job
5.9y ago
Nov 22, 2020
12 permits on record. Values are declared at filing.
Nov 22, 2020
No cost listed
Unit 4: new electical wiring for unit 4, including bathroom and kitchen. 200 amp service, subpanel, 20 lights, 10 switches, 10 receptacles, fan, dishwasher, garbage disposals, microwave, range, 4 smoke detectors.
288 27th StNoe Valleycomplete#Electrical
Nov 22, 2020
No cost listed
Unit 3: new electrical wiring for unit 3 - including bathroom and kitchen. 200 amp service. 1 subpanel. 20 lights, 10 switches, 10 receptacles, fan, dishwasher, garbage disposal, microwave, range, 4 smoke detectors.
288 27th StNoe Valleycomplete#Electrical
Nov 22, 2020
No cost listed
Unit 2: new electrical wiring for unit 2 including bathroom and kitchen. 200 amp service, 1 subpanel. 20 lights, 10 switches, 10 receptacles, fan, dishwasher, garbage disposal, microwave, range, 4 smoke detector.
288 27th StNoe Valleycomplete#Electrical
Oct 30, 2020
No cost listed
Unit 1,2,3,4: remodel work. new plumbing for one kitchen and one bathroom per units. for total of 4 kitchens 4 baths. replacing supply lines.
288 27th StNoe Valleycomplete#Bathroom remodel#Plumbing
Oct 30, 2020
No cost listed
Unit 1,2,3,4: new heating system
288 27th StNoe Valleycomplete#Plumbing
Oct 30, 2020
No cost listed
Unit 1- new electrical wiring for unit 1 including bathrooms and kitchens.200 amp service subpanel.
288 27th StNoe Valleycomplete#Electrical
Sep 10, 2020
No cost listed
Unit 7 and 8. new contractor takes over pw20200505262. addition of dwelling units at first floor. plumbing work include supply lines for 1 bathroom and 1 kitchen in each unit. drains are already in place. no drainwork to be performed.
654 Castro StCastro/Upper Marketexpired#Bathroom remodel#Plumbing
Sep 10, 2020
No cost listed
Unit 7 and 8: new heating system for the addition of two dwelling units located at the first floor.
654 Castro StCastro/Upper Marketcomplete#Plumbing
Sep 10, 2020
No cost listed
Unit 8: addition of dwelling unit at first floor. new electrical wiring and panel. new contractor takes over permit e202008249318.
654 Castro StCastro/Upper Marketcomplete#Electrical
Sep 10, 2020
No cost listed
Unit 7: addition of dwelling unit at first floor. new electrical wiring and panel. new contractor takes over permit e202008249318.
654 Castro StCastro/Upper Marketcomplete#Electrical
Aug 27, 2020
$165K
Renovation and remodeling of all kitchens and bathrooms, 6 kitchens and 6 bathrooms, no work other than kitchen and bathrooms
288 27th StNoe Valleycomplete#Kitchen remodel#Bathroom remodel
Feb 21, 2018
$200K
Addition of two dwelling units at ground flr per ord# 162-16. 1st unit w/ 1 bedroom, 2nd unit w/ 2 bedrooms. a modification of front facade @ ground floor (replace garage door with window)
654 Castro StCastro/Upper Marketcomplete#Windows#Siding & facade#Garage & driveway