Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
2.0y ago
Oct 21, 2024
4 permits on record. Values are declared at filing.
Oct 21, 2024
No cost listed
Work category: 2m ; supply and install a new mitsubishi ducted system. 1 mitsubishi 30k outdoor heat pump. model pva-a30aa7 (on roof) 1 mitsubishi 30k multi-positional air handler. model puz-a30nha7 (in closet) 1 drain line, 1 copper puron line, 1 communication line, 1 disconnect box with fuses. 1 new electrical whip. new r6 flex supply ducting with standard registers. new fiberglass insulated sheet metal fittings and boots. 1 new r6 return air duct with new filter grill and pleated filter. 1 new breaker per outdoor unit. 1 new 220v electrical wire from disconnect box to breaker of each outdoor unit
2582 Clay StPacific Heightscomplete#Plumbing#Heating & cooling
Oct 21, 2024
No cost listed
Work category: 2m ; 1 new mitsubishi 30k outdoor heat pump. model pva-a30aa7 1 new mitsubishi 30k multi-positional air handler. model puz-a30nha7 1 drain pan and drain line, 1 copper puron line, 1 communication line, 1 disconnect box with fuses, 1 new electrical whip. new rigid sheet metal ducting, new bubble wrap insulated sheet metal fittings and boots. 1 new return air duct with new filter grill and pleated filter. 1 new breaker. 1 new 220v electrical wire from disconnect box to breaker of outdoor unit
2580 Clay StPacific Heightscomplete#Plumbing#Heating & cooling
Jun 21, 2023
No cost listed
Work category: 1m; system 1: basement 1 new 2 ton heat pump unit. 1 new 2 ton multi-positional air handler. 1 new condensate pump, 1 new condensate drain line, 1 new copper puron line, 1 heat pump tstat with wiring. 2 new r6 supply ducts, relocate 2 existing supply ducts, relocate 1 existing return duct.
3526 19th StMissionexpired#Heating & cooling#Plumbing
Jun 21, 2023
No cost listed
Work category: 1m; system 2: first and second floors 1 new 4 ton heat pump unit. 1 new 4 ton multi-positional air handler. 1 new condensate pump, 1 new condensate drain line, 1 new copper puron line. 1 new dual zone control system. (includes: 1 new zone board, 2 new heat pump thermostats and new motorized dampers) 1 new bypass damper, relocate existing return duct, relocate supply y with damper to mechanical room. relocate 3 existing supply ducts, relocate kitchen exhaust vent pipe.
3526 19th StMissionexpired#Heating & cooling#Plumbing