Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$1.5K
Most recent job
1mo ago
Sep 3, 2026
186 permits on record. Values are declared at filing.
Sep 3, 2026
No cost listed
Install (1) new level 2 ev charger at existing residential parking garage. provide new branch circuit from existing ev1 panel, including conduit, conductors and associated electrical connections. charger to be integrated into existing evercharge load management system.
1150 Lombard StRussian Hillcomplete#EV charger
Aug 13, 2026
$1.5K
Common area parking space (64&65)-addition of (1) lv2 ev charger to (e) shared ev charging network. the addition will not add to the load of the site, instead it will share with the load available for the ev charger. the new charger will be added to (e)ev panel board with conduuit run to location.
1150 Lombard StRussian Hillissued#EV charger
Aug 13, 2026
No cost listed
Electrical design (4) lv2 electric vehicle charger to existing shared ev charing network. the addition will not add to the load of the site. instead it will share with the load available for the ev chargers. the new ev charger will be added to the existing panel board. (installation in shared garage)
1150 Lombard StRussian Hillcancelled#EV charger
Jul 9, 2026
No cost listed
Installation of new electrical infrastructure w/in the (e) parking garage to support future installatio of up to (40) level 2 ev chargin stations. work includes installation in new ev panel board. 112.5kva transformer, disconnnect, feeder conductor, conduit, submetering & electrical distributor equipment.
300 Berry StMission Bayissued#EV charger
Mar 1, 2026
No cost listed
Renew electrical permit ew202106116169. get a final inspection approval once distribution upstream is approved.
200 Brannan StFinancial District/South Beachissued
Mar 1, 2026
No cost listed
We are renewing ew202011101589 to make the following corrections to pass inspection: 1) provide ocp for secondary conductors within 25ft. 2) increase secondary wire size to 600 mcm for 400a. 3) increase gec and ssbj conductor size to 1/0 copper per 250.66 and 250.102. 4) properly support secondary conduit out of transformer.
200 Brannan StFinancial District/South Beachissued#Electrical
Apr 3, 2025
No cost listed
Electrical engineering designs for the installation of (10) electric vehicle (ev) charging stations (lv2). the electric vehicle chargers will be connect at a new panel dedicated to ev chargers.
2222 17th StMissionissued#EV charger
Mar 3, 2025
No cost listed
The subject location is considered seawall lot 337. the facility identification number (fin) is 3370-land1-1 10 level 3 chargers - commercial use, possible pay-to-charge (tbd). installation of 10 dcfc 180kw units with dual ports installation of 4000a nema 3r switchgear, & buss duct. 13.2 kv- 480v 3p 4c ew switchgear will be fed from existing utility xfmr ""pge 3,000 kva xfmr"" (pole mounted xfmr) 480/277v 3p 4/w; pg & e; buss duct feed
1051 03rd StMission Bayissued#Electrical
Feb 2, 2025
No cost listed
To install (1) evercharge ev02 charging station in parking space #34. installation will tap off existing junction box near existing evercharge station (parking space #42). distance from junction box to space #34 is approximately 300 feet.
451 Kansas StPotrero Hillcomplete#Electrical
Jan 26, 2025
No cost listed
Install ev002 48a level 2 evse via wall mount install consists of utilizing #6awg wire, 1" emt parking space is approx 105 ft. away
229 Brannan StFinancial District/South Beachcomplete#EV charger
Jan 9, 2025
No cost listed
Installation of 1 evses spc 258
229 Brannan StFinancial District/South Beachcomplete#Electrical
Jan 9, 2025
No cost listed
Online electrical permit: category 4a: installation of fire warning and controlled devices of up to 2,500 ft². installation of 1 evse - spc 258.
229 Brannan StFinancial District/South Beachfiled#EV charger
Jan 9, 2025
No cost listed
Online electrical permit: category 4a: installation of fire warning and controlled devices of up to 2,500 ft². installation of evse in spc 258.
229 Brannan StFinancial District/South Beachfiled#EV charger
Dec 4, 2024
No cost listed
Installation of (20) evse on shared 60amp circuits evse is to be wall mounted at parking spaces installation will consist of using #6 wire and #10 ground in sets of 1"" conduit. installation of 6x6x6 pull box to be installed in trapeez conduit will be neatly ran on unistrut to desired evse location from ev panel post bollards required for equipment protection project location: pier 48 shed b fin 1480-shedb-all.
1 Portcomplete#EV charger
Nov 13, 2024
No cost listed
Installing (1) 225a 3p 3w 120/208v dedicated ev panel in upper level garage and (1) 100a 3p 3w 120/208v subpanel in the lower level garage to accommodate both floors for evse usage.
1150 Lombard StRussian Hillcancelled#Electrical#EV charger
Nov 4, 2024
No cost listed
Installation of 1 evse parking space: p3
72 Townsend StFinancial District/South Beachcomplete#EV charger
Nov 3, 2024
No cost listed
Installation of one wall-mounted 48a level 2 evse in a parking garage (parking spot 105).
1333 Jones StNob Hillcomplete#EV charger
Oct 1, 2024
No cost listed
To install a charging station in parking space 47. 130' from panel #4 awg 3 wire shared with spot 44 1” emt 60’ from junction box. existing ev panel eaton 100 amp. no cell service/existing evercharge units in sight column/wall mount
1650 BroadwayPacific Heightscomplete#Electrical
Aug 29, 2024
No cost listed
Install one (1) evercharge level 2 charging station in parking space # g3 - 25. 70' from panel through existing hole in floor from g2 #6 awg dedicated circuit
2200 Sacramento StPacific Heightscomplete#Electrical
Jul 30, 2024
No cost listed
Installation of a 48amp ev02 surface mounted on column in communal parking stall 3 using 1" conduit
950 Tennessee StPotrero Hillcomplete#Electrical