Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$3.8K
Most recent job
5.4y ago
May 14, 2021
21 permits on record. Values are declared at filing.
May 14, 2021
No cost listed
Install electrical plugs and led lighting for laundrymat and dry cleaners. each with seperate subpanels and service disconnect. related to building permit# 2019-0213-2827 secondary voltage: 120/208 volts 4 wire/ 3 phase
35 Laguna StHayes Valleycomplete#Electrical
May 14, 2021
No cost listed
Install 2 attu/ compressors for commercial space of a laundrymat and dry cleaners. related to building permit 201902132827- install bathroom/mechanical room- exhaust fans and duct systems.
35 Laguna StHayes Valleyexpired#Bathroom remodel#Plumbing
May 14, 2021
No cost listed
Rough and finish plumbing for a commericial laundrymat and dry cleaners, related building permit 201902132827, install gas iines, dwv systems and ug piping.
35 Laguna StHayes Valleyexpired#Plumbing
Nov 1, 2018
No cost listed
4 plugs, 1 fan
138 Hyde StTenderloinexpired#Electrical
Nov 1, 2018
No cost listed
Bathroom sink, kitchen sink, remove and replace
138 Hyde StTenderloinexpired#Bathroom remodel#Plumbing
Oct 31, 2018
$5K
#7: remodel kitchen, very small with new cabinets and sink, remodel bathroom very small bathroom.
138 Hyde StTenderloinissued#Kitchen remodel#Bathroom remodel
May 30, 2018
No cost listed
Install (3) new service panels- 60amps, ref e201802271330.
930 Sutter StNob Hillexpired#Electrical
Mar 29, 2018
No cost listed
Install (5) led day-night sensor lights in egress corridor.
780 Post StNob Hillcomplete#Electrical
Mar 29, 2018
No cost listed
Repair hot and water heater and connections as needed.
780 Post StNob Hillexpired#Water heater
Mar 15, 2018
No cost listed
Remodel lavatory, wet bar area. remodel bathroom.
1201 Fulton StHayes Valleycomplete#Bathroom remodel#Plumbing
Mar 15, 2018
No cost listed
Upgrade residential electrical, 10 lights, 4 switches, 13 receptacles, 1 fan, 1 microwave, 2 smoke detector.
1201 Fulton StHayes Valleycomplete#Electrical
Feb 26, 2018
No cost listed
Relocate (3) hot water heaters.
930 Sutter StNob Hillexpired#Water heater
Feb 26, 2018
No cost listed
Relcoate (3) wate heater flues.
930 Sutter StNob Hillexpired#Plumbing
Feb 26, 2018
No cost listed
Install (7) led lights, exit signage.
930 Sutter StNob Hillexpired#Electrical
Feb 16, 2018
$55K
Interior remodel of extg attic into new family room, w/wet bar and bathroom. all mech, electrical, plumbing, and life safety work to be per code. no exterior alteration
1201 Fulton StHayes Valleycomplete#Bathroom remodel#Plumbing
Jan 7, 2018
No cost listed
Unit #14. remove old plugs and replace with child safety gfi. install 2 lights, 4 switches, 6 receptacles, 1 microwave, 1 range, 1 smoke detectors.
138 Hyde StTenderloincomplete#Electrical
Jan 7, 2018
No cost listed
New tub valve, new kitchen sink, p - trap, supply lines.
138 Hyde StTenderloincomplete#Bathroom remodel#Plumbing
Oct 23, 2017
$15K
To comply with nov #201304991 , unit #4; remove 3 old cabinets i kitchen , sink and faucet in kitchen, replace as new. new flooring, paint as needed laundry room remodel at basement.
138 Hyde StTenderloincomplete#Kitchen remodel
Jun 20, 2017
$1.2K
Unit 14: make necessary repairs to tubs/showers, r/r sheetrock as needed, firetape & mude, paint 2 coats, repair damaged walls & ceilings using waterproof gymsum. fire tape, mud paint two coats, comply with nov #201782321. maher na.
138 Hyde StTenderloinissued#Bathroom remodel
May 10, 2017
$2.5K
Repairs general maintenance per notice 201775211. n/a for maher.
780 Post StNob Hillcomplete