Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
2mo ago
Jul 23, 2026
500 permits on record (showing the 500 most recent). Values are declared at filing.
Jul 23, 2026
No cost listed
Install one 5-ton all-electric mitsubishi high-static heat pump system with nest smart thermostat, associated disconnect, branch circuit, and required electrical connections.
260 29th StNoe Valleycomplete#Heating & cooling#Electrical
Jun 5, 2026
No cost listed
Electrical lines/outlets for hvac - 30k btu
3500 19th StMissioncomplete#Heating & cooling#Electrical
May 22, 2026
No cost listed
Main service electrical panel upgrade to 200 amp
639 Hearst AvWest of Twin Peaksissued#Electrical
May 11, 2026
No cost listed
Work category: 1m; hvac ductless system installation
4440 20th StCastro/Upper Marketcomplete#Heating & cooling
Apr 24, 2026
No cost listed
Dedicated electrical lines/outlets for hvac ductless system installation
561 Valley StNoe Valleycomplete#Heating & cooling#Electrical
Apr 24, 2026
No cost listed
Dedicated lines/outlets for heat pump hvac system installation
549 28th StNoe Valleycomplete#Heating & cooling#Electrical
Apr 16, 2026
No cost listed
Hvac ductless system installation
4440 20th StCastro/Upper Marketcomplete#Heating & cooling#Electrical
Apr 3, 2026
No cost listed
Dedicated electrical line/outlets for hvac - ducted heat pump system installation
161 Arbor StGlen Parkcomplete#Heating & cooling#Electrical
Mar 11, 2026
No cost listed
Dedicated line/outlet for kitchen range hood
1130 Church StNoe Valleycomplete#Electrical
Mar 9, 2026
No cost listed
Main service electrical panel replacement
131 Turquoise WyNoe Valleycomplete#Electrical
Feb 26, 2026
No cost listed
Dedicated electrical line/outlets for hvac - ducted heat pump system installation
230 27th StNoe Valleyissued#Heating & cooling#Electrical
Feb 26, 2026
No cost listed
Work category: 1m; hvac - ducted heat pump system installation - 60k btu
230 27th StNoe Valleyissued#Heating & cooling
Feb 19, 2026
No cost listed
Dedicated electrical line/outlet for furnace installation
4302 17th StCastro/Upper Marketcomplete#Heating & cooling#Electrical
Feb 19, 2026
No cost listed
Work category: 1m; 80% efficiency two–stage furnace installation
4302 17th StCastro/Upper Marketcomplete#Heating & cooling
Jan 28, 2026
No cost listed
Work category: 1m; "mitsubishi" - hvac - ducted heat pump system installation + ductwork package (1st + 2nd floor)
3665 Clay StPresidio Heightsissued#Heating & cooling
Jan 28, 2026
No cost listed
Work category: 1m; "mitsubishi" - hvac - ducted heat pump system installation + ductwork package (3rd +4th floor)
3665 Clay StPresidio Heightsissued#Heating & cooling
Jan 15, 2026
No cost listed
Dedicated electric circuit for new hvac installation - c&h 36k btu
1494 Guerrero StNoe Valleycomplete#Heating & cooling#Electrical
Jan 15, 2026
No cost listed
Work category: 1m; hvac ductless system installation - "cooper&hunter" 36k btu
1494 Guerrero StNoe Valleycomplete#Heating & cooling
Jan 15, 2026
No cost listed
Dedicated circuit/outlet for "bryant" furnace installation
1944 15th AvInner Sunsetcomplete#Heating & cooling#Electrical
Jan 15, 2026
No cost listed
This pays for inspections related to original permit # pmw20260108689 filed 1/8/2026. dow: work category: 1m; "bryant" 80% efficiency single stage furnace installation
1944 15th AvInner Sunsetcomplete#Heating & cooling