Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
5mo ago
May 6, 2026
26 permits on record. Values are declared at filing.
May 6, 2026
No cost listed
Like-for-like replacement (no major upgrade in capacity) panel swap existing 225 amp system 1 house meter + 8 apartment meters = 9 meters total on (1) service disconnect.
2541 Folsom StMissionissued#Electrical
Apr 25, 2025
No cost listed
Existing neutral wire was stolen and damaged - project includes reconnecting neutral wire to main service panel
65 Elmira StBayview Hunters Pointcomplete#Electrical
Mar 13, 2025
No cost listed
Main panel upgrade from 100 to 200. 4 meters on one panel.
2888 Harrison StMissioncomplete#Electrical
Feb 21, 2024
No cost listed
Rewire entire house. 1 kitchen/, living room bathrooms, 1 laundry room, 1 garage, all bedrooms
2580 McAllister StLone Mountain/USFcomplete#Electrical
Jun 14, 2023
No cost listed
Rewire entire building with 200 amp main panel and (2) 100 sub panels. install 4" recess lights throughout. install switches and outlets.
27 17th AvSeacliffcomplete#Electrical
Mar 7, 2023
No cost listed
Open sheet rock in (2) rooms to inspect electrical wiring due to flooding
3672 Sacramento StPresidio Heightsissued#Electrical
Sep 26, 2022
No cost listed
Inspect existing electrical for existing adu
4629 18th StCastro/Upper Marketcomplete#Electrical
Jun 21, 2022
No cost listed
Install 125a mai npanel. 100a subpanel. rewire entire house.
587 Lisbon StExcelsiorcomplete#Electrical
Feb 4, 2021
No cost listed
Install ground rod for main panel. install subpanel for ground and 2nd level, add outlets on ground level and bathrooms. and also: install nema 14-50 receptacle for car charging in garage, with breaker at 240v 40 amps.
2472 Vallejo StPacific Heightscomplete#Electrical#EV charger
Jun 9, 2020
No cost listed
Wire (2) apartments - (2) kitchens (2) bathrooms (2) living rooms (2) bedrooms and install (1) 60 amp sub panel per apartment
3330 19th StMissioncomplete#Electrical
Jun 9, 2020
No cost listed
Wire (2) apartments - (2) kitchens (2) bathrooms (2) living rooms (2) bedrooms and install (1) 60 amp sub panel per apartment
3324 19th StMissioncomplete#Electrical
Jun 9, 2020
No cost listed
Wire (2) apartments - (2) kitchens (4) bathrooms (2) living rooms (4) bedrooms and install (1) 60 amp sub panel per apartment
3328 19th StMissioncomplete#Electrical
Jun 9, 2020
No cost listed
Wire (2) apartments - (2) kitchens (4) bathrooms (2) living rooms (4) bedrooms and install (1) 60 amp sub panel per apartment
3326 19th StMissioncomplete#Electrical
Apr 19, 2020
No cost listed
Upgrade (1) 25 amp 2 meter service to a 200 amp 3meter service. install (2) sub panels, (12) lights, (12) outlets.
619 Belvedere StInner Sunsetcomplete#Electrical
Feb 13, 2018
No cost listed
Install emergency exit lights
55 Polk StTenderloincomplete#Electrical
Feb 12, 2018
No cost listed
Re-wire entire apartment #13 and install (1) 60 amp sub-panel.
1966 California StPacific Heightscomplete#Electrical
Dec 18, 2017
No cost listed
Re-wire (6) apartment units. upgrade main service panel to 400 amp. install (6) sub-panels.
3324 19th StMissionissued#Electrical
Sep 22, 2017
No cost listed
(8) recess lights, (8) outlets, (2) switches
3035 20th AvSunset/Parksidecomplete#Electrical
Sep 13, 2017
No cost listed
Re-wire (3) bedrooms, (3) bathrooms, (1) living room and (1) game room
50 Terrace DrWest of Twin Peakscomplete#Electrical
Aug 24, 2017
No cost listed
Temporary service panel
155 29th StNoe Valleycomplete#Electrical