Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$37.5K
Most recent job
4.5y ago
Apr 18, 2022
17 permits on record. Values are declared at filing.
Apr 18, 2022
No cost listed
Rev pa202102054149 & 202204051564 per building inspection correction notice & report. propose a wet bar, wine cooler and a glass washer on 1/f per plan.
1421 22nd AvSunset/Parksidecomplete
Apr 5, 2022
$10K
Rev to pa202102054149: relocate laundry room from g/f to 2/f. convert (e) laundry room to (n) office and add 2 (n) storage rooms per plan.
1421 22nd AvSunset/Parksidecomplete
Aug 24, 2021
No cost listed
Remodel the (e) kitchen on 2/f per plan including bathroom. englarge door at (e) laundry room on g/f. new plugs, lights, switches, panelboard.
1421 22nd AvSunset/Parksidecomplete#Electrical
Aug 24, 2021
No cost listed
Enlarge door oening at (e) laundry room on g/f. remodel (e) ktichen and bathroom.
1421 22nd AvSunset/Parksidecomplete#Bathroom remodel#Plumbing
Feb 5, 2021
$60K
Enlarge the door opening at (e) laundry room on g/f per plan. remodel the (e) kitchen on 2/f per plan including bathroom remodel in like to like.
1421 22nd AvSunset/Parksideissued#Kitchen remodel#Bathroom remodel
Sep 19, 2020
No cost listed
426: change 1 outlet on top of the countertop.
250 King StMission Baycomplete#Electrical
Sep 19, 2020
No cost listed
426: replace kitchen sink faucet.
250 King StMission Baycomplete#Plumbing
Sep 16, 2020
$5K
Kitchen remodel, like for like. no structural, no electrical, no change in plmg fixture count.
250 King StMission Baycomplete#Kitchen remodel
May 9, 2019
$35K
Unit 2: kitchen remodel (88 sq. ft.), in-kind, new cabinets, countertop, sink, bring electrical up to code; bathroom remodel (40 sq. ft.), in-kind, new vanity, floor tile, countertop, sink, tub & wall tiles, bring electrical up to code; replace ceiling fan
755 19th AvOuter Richmondcomplete#Kitchen remodel#Bathroom remodel
May 9, 2019
No cost listed
Unit 2: kitchen & bathroom remodel, replace kitchen sink, bathroom sink & tub
755 19th AvOuter Richmondcomplete#Bathroom remodel#Plumbing
May 9, 2019
No cost listed
Unit 2: kitchen & bathroom remodel, bring electrical to code; 2 lights, 2 switches, 1 fan, 1 dishwasher, 1 garbage disposal, 1 microwave, 1 smoke detector
755 19th AvOuter Richmondcomplete#Electrical
Apr 17, 2019
$40K
#3: kitchen remodel like for like, new cabinets, countertop, new sink, electrical up to code; bathroom remodel like for like. new vanity, new floor tile, new countertop, new sink, new tub and wall tiles, electrical up to code, replace ceiling fan
775 19th AvOuter Richmondcancelled#Kitchen remodel#Bathroom remodel
Apr 17, 2019
No cost listed
Unit 3: upgrade the electrical subpanel to 125a panel and more spaces. kitchen electrical up to code. bathroom electrical up to code.
775 19th AvOuter Richmondcancelled#Electrical
Apr 17, 2019
No cost listed
Unit #3: replace kitchen sink, bathroom sink, and tub
775 19th AvOuter Richmondcanceled#Bathroom remodel#Plumbing
Apr 24, 2018
$40K
Kitchen, bathroom like for like remodel new cabinets counter tile tub sink, new electrical outlets up to code new valve.
4069 Mission StBernal Heightscomplete#Kitchen remodel#Bathroom remodel
Apr 24, 2018
No cost listed
Remodel kitchen and bathroom, includes sink, tub, toilet and shower, (1) shower pan
4069 Mission StBernal Heightscomplete#Bathroom remodel#Plumbing
Apr 24, 2018
No cost listed
Upgrade residential wiring, 4 switches, 16 receptacles, 1 fan, 1 dishwasher, 1 garbage disposal, 1 microwave, 1 range, 3 smoke detectors.
4069 Mission StBernal Heightscomplete#Electrical