Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
3mo ago
Jul 27, 2026
58 permits on record. Values are declared at filing.
Jul 27, 2026
No cost listed
Provide and install a new dedicated circuit for the garage door opener. install a new dedicated circuit for the gas washer and dryer.
1290 Grove StHayes Valleyissued#Electrical
Sep 14, 2025
No cost listed
Remove the two existing heaters and install two new heaters in the same locations.
371 San Jose AvMissionissued#Electrical
Aug 27, 2025
No cost listed
Unit 204: correct wiring from main panel to sub panel. comply w/ eid nov 202532547
1290 Grove StHayes Valleyissued#Electrical
Jun 23, 2025
No cost listed
Provide and install five new motion light fixtures in the trash room and one customer provided exhaust fan
1801 California StWestern Additionissued#Electrical
Jun 9, 2025
No cost listed
Remove existing service and relocate like for like. 200amp
233 29th StNoe Valleycomplete#Electrical
May 22, 2025
No cost listed
Remove the existing fuse box from the closet and install a new subpanel in a legal location
233 29th StNoe Valleycomplete#Electrical
May 22, 2025
No cost listed
Remove the existing fuse panel from the closet and install a new subpanel in a legal location.
233 29th StNoe Valleycomplete#Electrical
May 22, 2025
No cost listed
Remove the fuse box from the closet and install a new sub-panel in a legal location.
233 29th StNoe Valleycomplete#Electrical
May 22, 2025
No cost listed
Remove the existing fuse box from the closet and install a new subpanel in a legal location.
233 29th StNoe Valleycomplete#Electrical
Dec 8, 2024
No cost listed
The living room is converted to a bedroom. period extend the branch circuit and install approximately five new outlets. install new circuits to the kitchen to bring up to code. install one subpanel.
176 Langton StSouth of Marketcomplete#Electrical
Feb 14, 2024
No cost listed
Extend the load side main disconnect to a termination can where it will be connected to a new four meter combo pack.
120 Gardenside DrTwin Peaksissued#Electrical
Feb 14, 2024
No cost listed
Provide and install a new 100 amp sub panel in unit #18. bring electrical up to nec code 2024. completely rewire entire unit.
120 Gardenside DrTwin Peakscomplete#Electrical
Feb 14, 2024
No cost listed
Provide and install a new 100 amp sub panel. bring electrical up to nec code 2024. completely rewire entire unit.
120 Gardenside DrTwin Peakscomplete#Electrical
Feb 14, 2024
No cost listed
Provide and install new 100 amp sub panel. bring electrical up to nec code 2024. completely rewire entire unit #17
120 Gardenside DrTwin Peakscomplete#Electrical
Feb 14, 2024
No cost listed
Provide and install a new 100 amp sub panel in unit #19. bring unit up to nec codes for 2024. completely rewire entire unit
120 Gardenside DrTwin Peakscomplete#Electrical
May 21, 2023
No cost listed
Provide and install new wiring throughout the entire unit. install a new subpanel.
1725 Turk StWestern Additioncomplete#Electrical
May 21, 2023
No cost listed
Provide and install new wiring throughout the entire unit. install a new subpanel.
1725 Turk StWestern Additioncomplete#Electrical
May 21, 2023
No cost listed
Provide and install new wiring throughout the entire unit. install a new subpanel.
1725 Turk StWestern Additioncomplete#Electrical
Jan 9, 2023
No cost listed
Provide and install two dedicated circuits. run each circuit to a new baseboard heater. install baseboard heater with a built-in thermostat.
371 San Jose AvMissioncomplete#Electrical
Jan 8, 2023
No cost listed
Remove the existing service and relocate to a new location. install a new 400 amp overhead panel with a new 4” riser.
1725 Turk StWestern Additioncomplete#Electrical