Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$64K
Most recent job
5mo ago
Apr 28, 2026
80 permits on record. Values are declared at filing.
Apr 28, 2026
No cost listed
Installation of new furnace with venting.
519 Monterey BlWest of Twin Peakscomplete#Heating & cooling
Apr 1, 2026
$105.7K
Change of use from vacant commerical tenant space to a residential dwelling unit. interior alterations including new partition walls, kitchen, bathroom and associated mechanical, electrical and plumbing. no change to building envelope or exterior footprint.
521 Monterey BlWest of Twin Peaksissued#Kitchen remodel#Bathroom remodel#Plumbing
Nov 13, 2025
$40K
Repair of rear enclosed deck floor boards and wood rot - less than 50% - no structural (not street visible). demo basement storage framing, no structural.
840 York StMissioncomplete#Decks & stairs#Demolition & abatement
Oct 28, 2025
No cost listed
One new furnace to lower level unit.
90 Peralta AvBernal Heightscomplete#Heating & cooling
Oct 28, 2025
No cost listed
New electrical wiring to lower level, new bedroom, new kitchen, new living room and laundry room. add a new main panel. 200 amp panel. 25 lights, 8 switches, 28 receptacles, 1 d/w, 1 g/d, 1 microwave, 1 range, 4 s/d. one refrig and two furnaces.
90 Peralta AvBernal Heightscomplete#Electrical#Heating & cooling
Oct 28, 2025
No cost listed
Additioin of 1 full bathroom and kitchen to basement level.
90 A Peralta AvBernal Heightscomplete#Bathroom remodel#Plumbing
Jun 6, 2025
$189K
1. complying with nov #202422466 & nov # 202288431. 2. addition of adu as per state program. legalize the kitchen on the 2nd floor. legalize the habitable space on the ground level.
90 A Peralta AvBernal Heightscomplete#Kitchen remodel#ADU & in-law units
May 27, 2025
No cost listed
Rewiring of complete house with the replacing of electrical panels with a two meter panel. 40 lights, 15 switches, 35 receptacles.
519 Monterey BlWest of Twin Peakscomplete#Electrical
May 27, 2025
No cost listed
Two complete bathroom remodels with bathroom added in garage. remodel of kitchen. 2 shower pans.
519 Monterey BlWest of Twin Peakscomplete#Bathroom remodel#Plumbing
Apr 30, 2025
No cost listed
Replacement of drain lines and vents for 2 and a half bathrooms, 1 kitchen, 1 laundry, replacement of water lines for those fixtures, water heater rplacement, shower pan
1550 Leavenworth StNob Hillcomplete#Bathroom remodel#Plumbing#Water heater
Apr 30, 2025
No cost listed
Deenergize nob and tube, rewiring kitchen and bathrooms; replacing lights @ kitche, bathroom and hallway18 lights, 13 switches, 25 receptacles, 2 fans, dishwasher, garbage disposals, microwave, range, 5 smoke detectors
1550 Leavenworth StNob Hillcomplete#Electrical
Apr 23, 2025
$85K
Interior only: renovate 1548 kitchen, toilet & bath. new plumbing and electrical. 3 new windows 2 like for like 1 sim. renovate 1550 bathroom, fixtures in place, new finishes. repair damaged joists & studs
1548 Leavenworth StNob Hillcomplete#Windows#Kitchen remodel#Bathroom remodel#Plumbing
Feb 20, 2025
$10K
Revision per pa #202405242969
519 Monterey BlWest of Twin Peaksfiled
Dec 8, 2024
No cost listed
Re-route plumbing for existing sink, toilet and shower. (1) shower pan
2725 20th StMissioncomplete#Bathroom remodel#Plumbing
Dec 8, 2024
No cost listed
Add three switches, 2 plugs and replace the fan light plus add a light above the sink. (2) lights, (3) switches, (2) receptacles, (1) fan.
2725 20th StMissionissued#Electrical
Nov 25, 2024
$5K
Revision to pa# 202405242969: (n) trellis partially cover 2/f deck mainly to cover the rear deck stairs.
519 Monterey BlWest of Twin Peaksissued
Nov 1, 2024
No cost listed
Revision to pa #202403298919. removed proposed 1 full bath. existing half bath to remain at level 2 and 3. reduced scope of wall reconfigurations. remove o f proposed voluntary plywood stiffenig walls and update 2 spread foundations supporting basement post.
1415 Golden Gate AvWestern Additioncomplete
Oct 21, 2024
No cost listed
New electrical wiring throught each unit. addition of new sub panel in each unit and addition of new main panel in unit.
1417 Golden Gate AvWestern Additioncomplete#Electrical
Aug 21, 2024
No cost listed
Units : (1415-1419 golden gate) new electrical wiring throught each unit. addition of new sub panel in each unit and addition of new main panel in each unit. (2-200amps) (50 lights, 25 switches, 90 receptacles, 2 dishwasher, 2 garbage disposal, 2 microwaves,2 ranges and 10 smoke detectors)
1415 Golden Gate AvWestern Additionissued#Electrical
Aug 21, 2024
No cost listed
Remodel of 2 existing bathrooms & addition of 2 full bathrooms (1 in each unit) 1 shower pan in each
1415 Golden Gate AvWestern Additioncomplete#Bathroom remodel#Plumbing