Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$65K
Most recent job
2.9y ago
Dec 5, 2023
31 permits on record. Values are declared at filing.
Dec 5, 2023
$50K
Renovate two bathrooms in condominum units, including new laundry hook ups at former stall shower.
2427 Lake StOuter Richmondcomplete#Bathroom remodel
Jul 6, 2023
$30K
#401 - 4th flr - renovate kitchen all new cabinets, flooring, countertops, and finishes, upgrade electrical throuout, replace hardwood floors in kind, and built-in cabinet at dining room install two interior doors at (e) openings.
2701 Van Ness AvMarinacomplete#Kitchen remodel
Jul 6, 2023
$30K
#401 - 4th flr - renovate kitchen all new cabinets, flooring, countertops, and finishes, upgrade electrical throuout, replace hardwood floors in kind, and built-in cabinet at dining room install two interior doors at (e) openings.
2701 Van Ness AvMarinacomplete#Kitchen remodel
Jun 14, 2023
$1K
To comply with physical inspection report cc-8600
188 Liberty StMissioncomplete
Jun 14, 2023
$40K
Revision to permit 202204192474. infill lightwell at 1/f against neighbor blind wall to create master closet. renovate power room at 1/f, modification to rear bedroom layout. renovate master bathroom, new laundry room.
626 41st AvOuter Richmondcomplete
May 25, 2023
No cost listed
To comply w/ physical inspection report #cc-8365
2145 Powell StNorth Beachcomplete
May 25, 2023
No cost listed
To comply w/ physical inspection report #cc-8364
2151 Powell StNorth Beachcomplete
Mar 29, 2023
$65K
In-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 2nd fl with 0 shower pan(s).
41 Collins StPresidio Heightscomplete#Kitchen remodel#Bathroom remodel
Apr 19, 2022
$40K
Create new master bathroom, old bathroom to become powder room move laundry, install tankless water heater. all work on 1st fl only.
626 41st AvOuter Richmondcomplete#Bathroom remodel#Water heater
Feb 14, 2022
$140K
Convert rear area of existing ground flr into new habitable space. build a new study bathroom & great family room. rebuild the smaller utillity rm. no work on 2nd & 3rd floors. construct (n) 1 hr wall separation between garage & (n) habitable space.
3134 Lyon StMarinacomplete#Bathroom remodel
Sep 16, 2021
$5K
Revisioin to pa# 201706129044-s1. revisioin incorporates changes to the rear deck, opening types and foundation.
4072 Cesar Chavez StNoe Valleycomplete#Foundation#Decks & stairs
Apr 14, 2021
$45K
All work at lower unit. project includes renovating kitchen, including enlarging opening at wall. new larger paneling door at the yard. renovate bathroom in-kind. add laundry at closet.
188 Liberty StMissioncomplete#Kitchen remodel#Bathroom remodel
Apr 14, 2021
$250K
Addition of roof deck at extg flat roof adjacent to third story. project includes full replacement.
3161 Jackson StPresidio Heightscomplete#Decks & stairs
Feb 2, 2021
$65K
Remodel 2 (e) bathrooms. no change in layout of walls and openings. maintain 1 hr separation b/t units at area of work.
2425 Lake StOuter Richmondcomplete#Bathroom remodel
Dec 7, 2020
$1.1M
Interior alterations throughout including new finishes, cabinetry, appliances, light fixtures, plumbing fixtures, & interior stair addition. removal of interior partitions associated structural system mods. replace windows, doors, skylightts, exterior cladding, hydronic heating system, & landscaping
160 Anderson StBernal Heightsissued#Windows#Plumbing
Jun 9, 2020
$8K
No description
1812 Lyon StPacific Heightscomplete#Roofing
Jul 16, 2019
$180K
Remodel & reconfiguration of upper unit. project inclues addition of a new bathroom, relocation of kitchen & laundry, add new finishes throughout.
50 Clayton StLone Mountain/USFcomplete#Kitchen remodel#Bathroom remodel
Jul 16, 2019
$180K
Remodel & reconfiguration of upper unit. project inclues addition of a new bathroom, relocation of kitchen & laundry, add new finishes throughout.
50 Clayton StLone Mountain/USFcomplete#Kitchen remodel#Bathroom remodel
May 21, 2019
$25K
Bathroom remodel which includes 12 sq ft addition to eliminate lightwell at new, neighboring blind wall
49 Alma StHaight Ashburycomplete#Bathroom remodel
May 21, 2019
$12.5K
Addition of a deck off the second story main living level. installation of a sliding door at existing window location to access new deck.
92 Winfield StBernal Heightsfiled#Windows#Decks & stairs