Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$22.5K
Most recent job
3mo ago
Jul 9, 2026
53 permits on record. Values are declared at filing.
Jul 9, 2026
No cost listed
Work category: 1m; replace 2 reznor heaters in building 1, replace 2 reznor heaters in building 2, replace 1 heater in building 4
2 Townsend StFinancial District/South Beachissued#Heating & cooling
May 29, 2026
No cost listed
Work category: 1m; replacement four rtus on roof
915 Battery StFinancial District/South Beachcomplete#Heating & cooling
Oct 16, 2025
No cost listed
Work category: 5p; adding (8) area drains area drain installs at whole foods parking deck at ponding areas.
2001 Market StCastro/Upper Marketcomplete#Plumbing
Jul 2, 2025
No cost listed
Work category: 5m; vrf system for a private school. new construction.
3270 18th StMissioncomplete#Heating & cooling
Dec 11, 2024
No cost listed
Work category: 2pb; plumbing permit required by city for fire damaged unit. no in wall plumbing repairs to be made. replace kitchen sink/faucet/garbage disposal.
1028 Market StTenderloincomplete#Plumbing
Dec 9, 2024
No cost listed
Work category: 3pb; 4 story school building with a kitchen on first floor. core restrooms on each floor.
3270 18th StMissionreinstated#Plumbing
Jul 12, 2023
No cost listed
Work category: 8p; 9 instantaneous 199 kbtu water heaters on roof
2750 19th StMissioncomplete#Water heater
Jul 12, 2023
No cost listed
Work category: 3pc; building appliances 63 dishwashers 52 fridges 63 washing machinesand to complete permit pw20221216389 and pw20211207048
2750 19th StMissioncomplete#Plumbing
Jan 4, 2023
No cost listed
Work category: 1m; to finalize expired permit pmw20210222883 - the scope covers the following 3mc; installation of the following systems - 109 residential units - 110 vrf vertical fan coils, bathroom exhaust fans. common areas will have vrf units with condensers roof. mau and co system
1554 Market StHayes Valleycomplete#Heating & cooling#Bathroom remodel
Dec 27, 2022
No cost listed
Work category: 3pc; final plumbing inspection for 1554 market street to finalize expired permit pw20200928015. 3pc; multi family apartment building, with future retail. basement boiler system, domestic water hot and cold, natural gas to stovetops, booster system. units - 109 - plumbing fixtures - 672
1554 Market StHayes Valleycomplete#Plumbing#Heating & cooling
Dec 15, 2022
No cost listed
Work category: 3pb; finish inspections for residential apartments.
2750 19th StMissioncomplete#Plumbing
Sep 26, 2022
No cost listed
Work category: 3mb; 20 residential fan coils and 6 common area split systems
2750 19th StMissioncomplete#Plumbing
Mar 1, 2022
No cost listed
Work category: 8p; boiler inspection for (1) boiler - boiler #4
1554 Market StHayes Valleycomplete#Water heater#Heating & cooling
Feb 23, 2022
No cost listed
Low voltage control wiring for all mechanical equipment - vrf heat pump, 2 branch controlles, 11 vrf fan coil units, 2 heat pumps split systems.
1028 Market StTenderloincomplete#Heating & cooling#Electrical
Dec 6, 2021
No cost listed
Work category: 3pc; 63 unit, 6 story apartment building. new construction.
2750 19th StMissioncomplete#Plumbing
Nov 3, 2021
No cost listed
Work category: 8p; 16 tankless water heaters
1028 Market StTenderloincomplete#Water heater
Oct 13, 2021
No cost listed
Work category: 8p; boiler inspections for boiler commissioning & misc plumbing rough in inspection : including but not limited to dwv, hot & cold water supply, gas supply/ distribution and plumbing finish
1554 Market StHayes Valleyexpired#Water heater#Plumbing#Heating & cooling
Sep 7, 2021
No cost listed
Work category: 8p; 3 new boiler installation
830 Eddy StWestern Additioncomplete#Water heater#Heating & cooling
May 3, 2021
No cost listed
Work category: 3pc; final inspections for apartment building with 137 units
830 Eddy StWestern Additioncomplete
Feb 21, 2021
No cost listed
Work category: 3mc; installation of the following systems - 109 residential units - 110 vrf vertical fan coils, bathroom exhaust fans. common areas will have vrf units with condensers roof. mau and co system
1554 Market StHayes Valleyexpired#Bathroom remodel#Plumbing