Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
1.5y ago
Apr 15, 2025
20 permits on record. Values are declared at filing.
Apr 15, 2025
No cost listed
Furnish and install (77) cat 6 cables for ap's, cameras, lighting hubs and i-pad devices. furnish and install (9) 18-2 cables for speakers.
3251 20th AvLakeshoreissued#Electrical
Apr 15, 2025
No cost listed
Furnish and install (69) cat 6/6a cables. install it equipment in idf. install desktop equipment in offices and conference rooms.
2 Embarcadero CenterFinancial District/South Beachcomplete#Electrical
Aug 1, 2023
No cost listed
Furnish and install cat 6 cable to workstations, wireless aps, and security cameras. install racks and terminate.
450 Shotwell StMissioncomplete#Electrical
Apr 11, 2022
No cost listed
Station cabling, wireless, security cabling, lan
4 Embarcadero CenterFinancial District/South Beachexpired#Electrical
Jun 16, 2021
No cost listed
Scope furnish and install cat 6 to office and exam room locations
1 Daniel Burnham CtWestern Additioncomplete#Electrical
Mar 19, 2021
No cost listed
Scope of work: • furnish and install (2) cat 6 to 72 designated locations • furnish and install (2) cat 6 to 8 wireless access point locations • furnish and install (8) wireless access points • furnish and install (1) 4-post server rack • all product for the install will be leviton
505 Montgomery StChinatowncomplete#Electrical
Nov 18, 2019
No cost listed
Furnish and install (44) cat 6 cables to office, wifi, ph and printer locations
88 Kearny StFinancial District/South Beachcomplete#Electrical
Oct 1, 2019
No cost listed
Cat 6a data cable on the 19th and 20th floor
71 Stevenson StFinancial District/South Beachcomplete#Electrical
Feb 5, 2019
No cost listed
Furnish and install (652) cat 6 cables, server racks. security and av included
50 Beale StFinancial District/South Beachcomplete#Electrical
Jan 21, 2019
No cost listed
Scope: labor to install data, card access and cctv cables labor to build out server room labor to terminate end to end, label and test
180 Howard StFinancial District/South Beachexpired#Electrical
Mar 28, 2018
No cost listed
Provide and install cat 6 cabling · 5 conference rooms . 2 storage rooms · 1 shipping/receiving room ·
680 Folsom StFinancial District/South Beachcomplete#Electrical
Oct 30, 2017
No cost listed
Install low voltage cabling, 140 cables total.
560 Mission StFinancial District/South Beachcomplete#Electrical
Sep 27, 2017
No cost listed
Install and/or reroute of horizontral communication cable, cat 6 plenum cable, patch panels and racking, 48 cables total.
250 Montgomery StFinancial District/South Beachcomplete#Electrical
Sep 18, 2017
No cost listed
6th floor. installation of horizontal communications cable, cat 6 plenum cable, patch panels and racking, 73 cables
100 California StFinancial District/South Beachcomplete#Electrical
Sep 18, 2017
No cost listed
Regus # 4477 levi plaza spaces - installation of horizontal communications cable, cat 5e plenum cable, patch panels and racking, 431 cables
1160 Battery StFinancial District/South Beachexpired#Electrical
Aug 25, 2017
No cost listed
Installation of low voltage cat6 cables, 309cables total.
1 Montgomery StFinancial District/South Beachcomplete#Electrical
Aug 25, 2017
No cost listed
Installation of low voltage cat6 cables, 235 cables total.
650 California StChinatownexpired#Electrical
Aug 9, 2017
No cost listed
Installation of horizontal communications cable, cat 6 plenum cable, patch panels and racking
90 New Montgomery StFinancial District/South Beachcomplete#Electrical
May 5, 2017
No cost listed
Installation of horizontal communications cable, cat 6 premium cable, patch panels, and racking, 410 cables total.
680 Mission StFinancial District/South Beachcomplete#Electrical
Feb 28, 2017
No cost listed
Installation of horizontal communications cable, cat 6 plenum cable, patch panels and racking
221 Main StFinancial District/South Beachcomplete#Electrical