Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$60K
Most recent job
5.3y ago
Jun 24, 2021
12 permits on record. Values are declared at filing.
Jun 24, 2021
No cost listed
Kitchen remodel- two bathrooms- upgrading to current code- lighting in livingroom/ dining room- electric fireplace
2060 Sutter StPacific Heightscomplete#Electrical
Jun 24, 2021
No cost listed
Change shower valves in both bathrooms: change out one bathtub and one shower pan, replace kitchen sink and faucet: replace bath vanity sinks and faucets: for all above: upgrade only. no location change.
2060 Sutter StPacific Heightscomplete#Bathroom remodel#Plumbing
May 26, 2021
$60K
Remodel and replace kitchen cabinets and counter top. remodel two bathrooms.
2060 Sutter StPacific Heightscomplete#Kitchen remodel#Bathroom remodel
Dec 10, 2019
$20K
Revision to pa# 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles.
2526 BroadwayPacific Heightsissued
Dec 9, 2019
No cost listed
Remodel (e) kitchen & remodel of 3 bathrooms including 3 shower pans.
2526 BroadwayPacific Heightscomplete#Bathroom remodel#Plumbing
Dec 9, 2019
No cost listed
Remodel (e) kitchen & remodel of 3 bathrooms. new plugs, lights, switches. renovation of interior condo.
2526 BroadwayPacific Heightscomplete#Electrical
Aug 20, 2019
$60K
Rev to pa# 201908017616; removal of (e) stair between 3rd & 4th fl.
2526 BroadwayPacific Heightsissued
Aug 1, 2019
$60K
Renovation of condo unti withing a 6 unit bldg. condo is on 3rd & 4th fl of 4-story bldg. no work on 1st & 2nd fl. scope includes selective demo & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights.
2526 BroadwayPacific Heightscomplete#Windows#Kitchen remodel#Bathroom remodel#Demolition & abatement
Mar 28, 2018
No cost listed
Kithcen remodel, 2 bathroom remodel.
720 Duboce AvHaight Ashburycomplete#Bathroom remodel#Plumbing
Mar 28, 2018
No cost listed
Kitchen remodel, 2 bathroom remodel. running power to new furnances, changing outlets and switches. 30 lights, 30 switches, 40 receptacles, 1 dishwasher, 1 garbage disposal, 1 microwave, 1 range, 6 smoke detectors.
722 Duboce AvHaight Ashburycomplete#Electrical
Mar 28, 2018
No cost listed
Installing 2 furnaces and ducts.
722 Duboce AvHaight Ashburycomplete#Heating & cooling
Mar 27, 2018
$160K
720: 1st floor: remove wall at kitchen, remodel kitchen and bathroom, replace all windows, add furnace. 722: 2nd floor: remodel bathroom, replace windows, add furnace. replace less than 50% of extg rear stair. maher na
720 Duboce AvHaight Ashburycomplete#Windows#Kitchen remodel#Bathroom remodel#Heating & cooling