Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
5mo ago
Apr 29, 2026
20 permits on record. Values are declared at filing.
Apr 29, 2026
No cost listed
Remove the old 50-amp 120/240 volt subpanel and install a new 100 amp 120/240 volt electrical sub panel with 12/24 spaceso, remove old wall light and install new light, remove old ceiling light and install new light, remove 4 old switches, and gfi and install new, no of lights 2, switches 4, receptacles 1-gfi
408 Jersey StNoe Valleycomplete#Electrical
Feb 10, 2026
No cost listed
Remove old electric subpanel and install new panel 120/240v, 50amp 12/24 spaces. pull new wire #8 strander for ground panel
645 Baker StLone Mountain/USFcomplete#Electrical
Feb 10, 2026
No cost listed
Install new elctrical subpanel, 120/240v. 50amp 12/24 spaces. install 3 gfci 15amp 120v. remove old 0.5" pipe conduit and fix j-box
267 24th AvOuter Richmondcomplete#Electrical
Sep 17, 2025
No cost listed
Install and supply electrical wire for 3 outlets 120 vol, 15 amp (gfi) for garage door. run 2 electrical circuit, 120vol, 20 amp.
130 Grand View AvTwin Peakscomplete#Electrical
Jun 30, 2025
No cost listed
Replace old electrical main service of 100 amps, and install new electrical main service of 125 amps.
284 Allison StExcelsiorcomplete#Electrical
Apr 30, 2025
No cost listed
Remove electrical wires in the storage
630 Jones StTenderloincomplete#Electrical
Nov 17, 2024
No cost listed
200 amp main breaker upgrade to 400 amp-14 meters
1221 Greenwich StRussian Hillissued#Electrical
Mar 3, 2024
No cost listed
Replace old main panel single phase 100 amp. 120/240 volt for new main panel 125 amp. single phase, 240-120 volt. 20 spaces.
2107 15th AvWest of Twin Peaksissued#Electrical
Jan 28, 2024
No cost listed
Replace old subpanel 100 amp for 1 new subpanel 200 amp. 30/42 spaces.
687 Campbell AvVisitacion Valleycomplete#Electrical
Oct 3, 2023
No cost listed
Apt #4. kitchen, laudnry and bathroom remodel. install new subpanel 60 amp, 240 volt single phase. 20 spaces. 12 circuits, 4 lights, 6 switches, 15 receptacles, 1 fan, 1 g/d, 1 microwave, 1 range. 240 volt, 30 amp dryer = 1 washer.
2418 Washington StPacific Heightscomplete#Electrical
Jun 9, 2022
No cost listed
Upgrade existing electrical panel from 100 amps to 200 amps. main service.
1878 Great HySunset/Parksidecomplete#Electrical
Jun 9, 2022
No cost listed
Inspect existing dedicated circuit for automatic door.
1900 Market StHayes Valleycomplete#Electrical
Jan 6, 2022
No cost listed
Request a pre-inspection to determine the exact place where to locate the subpanes and determine what is the correct job to do.
1249 04th AvInner Sunsetcancelled#Electrical
Nov 23, 2021
No cost listed
Unit #3. to comply with complaint #202183757: labeled name of main panel and sub panel for unit 3. check all electrical systems in unit 3.
642 Central AvLone Mountain/USFcomplete#Electrical
Mar 10, 2021
No cost listed
Install 3 new outlets and floor for counter
1365 Columbus AvRussian Hillcomplete#Electrical
Feb 25, 2020
No cost listed
Install new 200amp service panel.
251 Morningside DrSunset/Parksidecomplete#Electrical
Jan 13, 2020
No cost listed
5th fl - remove 1 sub panel. install 2 can lights, 1 fan, 1 gfi in bathroom. install switches, outlets, and emergency lights.
1920 Market StHayes Valleycomplete#Electrical
Nov 4, 2019
No cost listed
New service panel 100 amps in garage
481 Justin DrBernal Heightscomplete#Electrical
Oct 28, 2019
No cost listed
New 100amp service
554 Banks StBernal Heightscomplete#Electrical
Sep 16, 2019
No cost listed
Electrical job in 1 bahtroom and 1 bedroom in the garage. electrical wiring and electrical fixture as needed.
554 Banks StBernal Heightscomplete#Electrical