Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
5.6y ago
Mar 5, 2021
12 permits on record. Values are declared at filing.
Mar 5, 2021
No cost listed
Installing a new meter set with new 100a disconnects for each address (588, 586, 590), termination can and underground ducts. for 220a total service.
590 Greenwich StNorth Beachcomplete#Electrical
Feb 8, 2021
No cost listed
1 ev charger outlet, 2 switches, 3 exterior garden lights, back door light, 2 garden receptacles, one circuit at 20a@120v, one circuit at 40a@240v, both on house meter
646 04th AvInner Richmondcomplete#EV charger
Feb 7, 2020
No cost listed
Rewire all outlets in and add outlets (except in kitchen and bath/toilet rooms): 12 convenience plug, 6 light, 2 smoke/co, 9 switches, 3 afci circs, 1 circ brkr panel in basement.
588 Greenwich StNorth Beachcomplete#Electrical
Feb 7, 2020
No cost listed
Rewire all outlets in flat and add outlets (except in the kitchen and bath & toilet rooms): 12 conv. receptacles, 7 light, 2 smoke/co, 8 switches, 3 120v afci circs, 1 circ brkr panel in basement
586 Greenwich StNorth Beachcomplete#Electrical
Feb 7, 2020
No cost listed
Rewire entire flat and add outlets and switches: 22 conven recpt, 15 light, 2 smoke/co, 40a range outlet, gar dspsr ol, dw ol, rng hood ol, 2 bath exh fans,18 switch, 10 120v afci circuits, 1 240v 40a circ, 1 100a/240v feeder and circ brkr subpanel in flat, 1 100 amp main circ brkr panel in basement
590 Greenwich StNorth Beachcomplete#Electrical
Dec 18, 2017
No cost listed
225 hartford st. apt 2: correct electrical viiolations noted on nov 201301281: remove kitchen's and living room's hazardous lighting fixtures; install required gfci protection at kitchen & bath room plug receptacles.
225 Hartford StCastro/Upper Marketcomplete#Electrical
Oct 16, 2017
No cost listed
New 6 meter (5 apartments and 1 house) 200 ampere single phase 120/240v service and to correct electrical service portion of nov 201301281
225 Hartford StCastro/Upper Marketcomplete#Electrical
Aug 18, 2017
No cost listed
Apt #4 & ground floor storage & common areas: 30 lights, 24 plug outlets, 22 lt switches & motion controls, 2 exhaust fans, 1 range hood, 1 dishwasher, 1 disposer, 1 9.2 kw range, 1 120 v laundry plug outlet, 14 circuits, new cb panel w/ 90a feeder; ¾ inch conduit run for solar readiness.
225 Hartford StCastro/Upper Marketcomplete#Solar & batteries
Mar 23, 2017
No cost listed
Apt #1 elect work part of rear enclosed porch remodel & new rear exterior egress stairs . 1. correct nov 201390061 (install missing cable connectors in apt #1 porch); 2. rplc (e) fpe circ pnl w/ new 16 position pnl; install 3 convenience plug outlets, a new exterior lt outlet w/ interior wall switch, an exterior plug outlet @ the landing, a new laundry plug outlet w/ new dedicated 120v circ, and move the (e) ceiling light outlet & its switch.
225 Hartford StCastro/Upper Marketcomplete#Electrical
Feb 28, 2017
No cost listed
Survey building electrical meter-disconnect area and existing service equipment to assess methods for adding a meter with a disconnect for the future basement apartment.
225 Hartford StCastro/Upper Marketcancelled#Electrical
Jan 28, 2017
No cost listed
Electrical work to: 1. move existing wiring as part of removing illegal basement apartment; 2. wire reconfigured rear rooms and stairs; 3. provide 120v circuit and receptacle outlet for space and water heating boiler and pumps; 4. correct n.o.v. 201530931; 5. prepare floor framing cavities for placing insulation beneath new hydronic heating tubes.
227 Hartford StCastro/Upper Marketcomplete#Heating & cooling#Electrical
Oct 27, 2016
No cost listed
Electrical work in apartment #3 to complete permit 201510282549 and as part of bathroom/laundry remodel. move (e) sub panel to correct clearance with 6 circuits (new and existing); provide plug and light outlets for new water heater; provide laundry (gas) plug, light, fan and 2 switches; install new bath-rm wiring for 1 plug, 4 lights, 1 fan, 2 switches; install 3 interconnected hardwired smoke/co detectors at existing halls and bedroom.
225 Hartford StCastro/Upper Marketcomplete#Water heater#Electrical