Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$35K
Most recent job
4.3y ago
Jul 5, 2022
40 permits on record. Values are declared at filing.
Jul 5, 2022
No cost listed
Unit 2: ceiling lights and switches
790 Great HyOuter Richmondexpired#Electrical
Jul 5, 2022
No cost listed
Kitchen and 2 bathrooms remodel
790 Great HyOuter Richmondexpired#Bathroom remodel#Plumbing
Jul 1, 2022
$39K
Apt 2: remodel one kitchen & 2 bathrooms. in kind non structural.
790 Great HyOuter Richmondissued#Kitchen remodel#Bathroom remodel
Jul 1, 2021
No cost listed
All needed 50 lighting, 12 switches,40 recepticals with circuits, 2 dish washer, 2 microwave, and brakers up to code
632 Commercial StChinatowncomplete#Electrical
Jul 1, 2021
No cost listed
Wvd for kitchen, 2 restroom at 2nd floor. wvd 3 restroom at 1st floor. wvd for kitchen, 4 restrooms at basement level
632 Commercial StChinatowncomplete#Plumbing
Jun 29, 2021
$8.5K
Remove old tile in bathroom, around bath tub, and install new tile. in apt #3 and 7 only.
1531 Francisco StMarinaissued#Bathroom remodel
Jun 11, 2021
No cost listed
Apt 3. upgrade electric work for kitchen and bath install new subpanel in the unit. 40 amp subpanel, 8 feeder, 2 lights, 2 switches, 10 receptacles, 1 dishwasher.
3201 Washington StPresidio Heightsissued#Electrical
Jun 11, 2021
No cost listed
Apt 12; upgrade electric work for kitchen and bath install new subpanel in the unit. 40 amp subpanel, 8 feeder, 2 lights, 2 switches, 10 receptacles, 1 dishwasher.
3201 Washington StPresidio Heightsissued#Electrical
Jun 11, 2021
No cost listed
Kitchen and bathroom remodel, no shower pan and no under ground work. work only in apt 3 and apt 12.
3201 Washington StPresidio Heightsexpired#Bathroom remodel#Plumbing
May 18, 2021
$30K
Unit 3 & 12: remodel kitchen - replace kitchen cabinet with like for like, replace bathroom toilet & sink & shower valve without refinishing. no structural work. all work inside units 3 & 12 only. no changes to wall & openings.
3201 Washington StPresidio Heightsissued#Kitchen remodel#Bathroom remodel
Jan 21, 2021
No cost listed
Apt 4: kitchen and bathroom remodel; no shower pan and no under ground work only in apt 4
1531 Francisco StMarinaexpired#Bathroom remodel#Plumbing
Jan 21, 2021
No cost listed
Apt 4: upgrade electric work through out apt 4 install new sub panel in the unit.
1531 Francisco StMarinaissued#Electrical
Dec 13, 2020
No cost listed
Demoexisting lights, outlets, switches and wiring. install new wiring for lights, switches and outlets according to new layour 12.
632 Commercial StChinatowncomplete#Electrical
Dec 13, 2020
No cost listed
One ada restroom, one restroom sail and kitchenette
632 Commercial StChinatowncomplete#Plumbing
Nov 10, 2020
$40K
Apt# 4: remodel kitchen and bathroom. open walls & ceilings to do electrical and plumbing work, upgrade electrical work in the apt. no structural work. no change to door and windows.
1531 Francisco StMarinaissued#Kitchen remodel#Bathroom remodel#Plumbing
Sep 28, 2020
No cost listed
Apt 510: upgrade electrical kitchen & bathroom. new subpanel. new plugs, lights, switches.
1155 Jones StNob Hillissued#Electrical
Sep 28, 2020
No cost listed
Remodel kitchen & bathroom.
1155 Jones StNob Hillexpired#Bathroom remodel#Plumbing
Sep 14, 2020
No cost listed
Unit 4: remodel kitchen and bathroom, up grade all electrical work in the apt, install sub panel in the apt.
2232 North Point StMarinaissued#Electrical
Sep 14, 2020
No cost listed
Apartment 4: remodel of kitchen, bathroom and luandry. bathtub to remain, now shower pan, no underground work.
2232 North Point StMarinaexpired#Bathroom remodel#Plumbing
Aug 24, 2020
$38K
Remodel kitchen and bathroom, upgrade elec through out the unit, add washer and dryer to clost, open plaster wall and replace with sheetrock to allow for plumbing and elec work, work will be only in apt #4, no change to door or windows, bathroom is 5x8 and kitchen is 8x10
2232 North Point StMarinaissued#Kitchen remodel#Bathroom remodel#Plumbing