Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$5K
Most recent job
1mo ago
Aug 31, 2026
239 permits on record. Values are declared at filing.
Aug 31, 2026
No cost listed
Work category: 5p; connect (4) rtus to (e) gas and condensate piping.
1945 Irving StSunset/Parksideissued#Plumbing
Aug 31, 2026
No cost listed
Work category: 5p; connect (3) rtus to (e) gas and condensate piping.
2485 San Bruno AvPortolaissued#Plumbing
Aug 18, 2026
No cost listed
Work category: 2pb; installation of break room sink, drinking fountain, floor drain, lavatory, mop sink, shower, water closets, electric water heater, and circulation pump. installation and insulation of supporting plumbing pipes, connections, fittings, valves; connection to main waste, dw, and vent lines. (1st inspection) installation of condensate pump and lines. (2nd inspection)
66 08th StSouth of Marketissued#Bathroom remodel#Plumbing#Water heater
Jul 27, 2026
No cost listed
Work category: 5m; relocation, repair, and furnishing of (4) fan coil units; repair, replacement, and installation of sheet metal ductwork; installation of (17) cooling vav boxes; final tab. includes piping for the fan coil units.
150 Spear StFinancial District/South Beachcomplete#Heating & cooling
Jul 15, 2026
No cost listed
Work category: 5p; ref permit #pw2025-0402-249 expired, pulling this permit to call for final on eyewash and handwash stations. backflow was signed off on permit #pw2026-0518-974.
2238 Geary BlJapantowncomplete#Plumbing
May 20, 2026
No cost listed
Work category: 5m; furnish and install secondary chilled water return and supply piping to iu-c-53,54,65,66 and iu-h-68. furnish and install heating hot water return and supply piping vav-20-11.
1 Embarcadero CenterFinancial District/South Beachcomplete#Heating & cooling
May 20, 2026
No cost listed
Work category: 5m; furnish and install heating hot water piping to vav-2.
44 Montgomery StFinancial District/South Beachcomplete#Heating & cooling
May 18, 2026
No cost listed
Work category: 5m; reconnect hydronic piping to vav
2300 Harrison StMissioncomplete#Heating & cooling
May 18, 2026
No cost listed
Work category: 5p; backflow preventer
2238 Geary BlJapantowncomplete#Plumbing
May 8, 2026
No cost listed
Work category: 5p; connect (e) condensate piping to new equipment
288 West Portal AvWest of Twin Peakscomplete#Plumbing
May 8, 2026
No cost listed
Install new disconnects for new equipment
288 West Portal AvWest of Twin Peakscomplete#Electrical
Apr 24, 2026
No cost listed
Work category: 5m; 20th floor: furnish and install heating hot water supply & return piping to vav rh-20-01,02,03,04,05,06,07,08,09,10,11,12,13.
555 Market StFinancial District/South Beachcomplete#Heating & cooling
Apr 24, 2026
No cost listed
Work category: 5m; 38th floor: furnish and install heating hot water supply & return piping to vav rh-38-11,12,13,14,15,16,17,18.
575 Market StFinancial District/South Beachcomplete#Heating & cooling
Apr 24, 2026
No cost listed
Work category: 5m; 40th floor: furnish and install heating hot water supply & return piping to vav rh-40-01,02,03,04,05,06,07,08,09,10,11,12,13,14,15,16.
575 Market StFinancial District/South Beachcomplete#Heating & cooling
Apr 24, 2026
No cost listed
Work category: 5m; 35th floor: furnish and install heating hot water supply & return piping to vav rh-35-01,02,03,04,05,06,07,08,09,10,11,12,13,14.
575 Market StFinancial District/South Beachissued#Heating & cooling
Apr 6, 2026
No cost listed
Work category: 5m; 6th floor: furnish and install heating hot water supply & return piping to vav 6-1b,6-5,6-6c,6-7b,6-8 & 610b. 7th floor: furnish and install heating hot water supply & return piping to vav 7-7b. furnish and install condenser water supply & return/condensate piping to wshp-1.
655 Montgomery StChinatowncomplete#Heating & cooling
Apr 6, 2026
No cost listed
Work category: 5m; install condensate and cws/r piping for hp-37
650 Davis StFinancial District/South Beachissued#Heating & cooling
Mar 4, 2026
No cost listed
Decommision (2) boilers: (1) laars m# mth0400nack2bxg serial #c16276199. (1) m# mt2h0400nack2bxg serial #c16276200.
1 Front StFinancial District/South Beachcomplete#Heating & cooling
Jan 26, 2026
No cost listed
This is to finalize the original permit #ew202009030151
101 Montgomery StFinancial District/South Beachcomplete#Electrical
Jan 19, 2026
No cost listed
Retrofit buildings outdated ddc controls system with with new johnson controls on air handling equipment, boiler, & chiller system. scope is on various floors.
101 Montgomery StFinancial District/South Beachcancelled#Heating & cooling#Electrical