Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$1M
Most recent job
2mo ago
Jul 22, 2026
34 permits on record. Values are declared at filing.
Jul 22, 2026
$170K
Install about 2800 lineal feet of chain link fencing in preparation of future work in areas of vacant housing project. fence is 6ft tall with 12-foot wide vehicular access gates and 3-foot wide personnel access gates. (bldgs will be demoed in the future uder separate permit)
178 Brookdale AvVisitacion Valleycomplete
Jul 9, 2026
No cost listed
Ug domestic water - 100 lf of 1.5" copper pipe & bfp, connection to (e) water meter. ug storm drain - 820 lf of 8" sdr 35 pip, 650 lf of 6" sdr 35 pipe, 35lf 8" tbd material for sfpuc tie-in, sand traps, biorention overflow inlet structure, cleanout. ug sanitary sewer - 100lf 4" sdr 35, cleanout, manhole.
485 Irwin StMission Bayissued#Plumbing
Sep 26, 2025
No cost listed
Install 7 each traps to existing sewer/storm lateral.
1049 Golden Gate AvWestern Additioncomplete#Plumbing
Sep 26, 2025
No cost listed
Install 3 each traps to existing sewer/storm lateral.
1111 Buchanan StWestern Additionexpired#Plumbing
Sep 23, 2025
No cost listed
Bldg 15 at 652 larch st. - install 5 traps to (e) sewer lateral
650 Larch StWestern Additionexpired#Plumbing
Sep 23, 2025
No cost listed
Install 1 trap to existing sewer/storm lateral
1239 Turk StWestern Additionexpired#Plumbing
Sep 23, 2025
No cost listed
Install 5 trap for sewer lateral
1050 McAllister StWestern Additionexpired#Plumbing
Sep 23, 2025
No cost listed
Install 6 each traps to existing sewer/storm lateral
1150 Buchanan StWestern Additionexpired#Plumbing
Sep 23, 2025
No cost listed
Install 1 trap to existing sewer/lateral
1251 Turk StWestern Additionexpired#Plumbing
Aug 21, 2025
No cost listed
Install a new (1) backflow for irrigation. install 10 feet of pipe between new city provided water meter and new backflow.
1050 McAllister StWestern Additionexpired#Plumbing
Aug 8, 2025
No cost listed
Ref to bldg pa# 202401294856: btw turk at & golden gate av. new electrical distribution to buchanan st park, n) pge connection, conduit installation & power distribition, pedestals, meters, lighting. 24 lights.
1151 Buchanan StWestern Additionissued#Electrical
Aug 8, 2025
No cost listed
New electrical distribution of buchanan st mal park renovation project. includes new pge connection conduit installation and power distribution, pedstal, meter and lighting. designed & submittals approved by alexis ng and brett desmarais with sfdpw. (1) new service, 50a, 2 pole main breaker, (2) 2in conduits. 6 circuits, 21 lights.
1225 Buchanan StWestern Additionissued#Electrical
Aug 8, 2025
No cost listed
New electrical distribution of buchanan street mall park renovation project. includes new pge connection conduit installation and power distribution, pedestals, meter and lighting. designed and submittals approved by alexis ng and brett desmarais with sfdpw. (50 lights, 2 switches, 1new service,50a, 2 pole main breaker, (3) 2 in conduits and 10 circuits - stage lighting controller)
951 Buchanan StWestern Additionissued#Electrical
Aug 8, 2025
No cost listed
Install new irrigation system btw city water meter to 1ea backflow, irrigation 1 backflow & 10 ft of pipe
1050 McAllister StWestern Additionpos sent#Plumbing
Aug 8, 2025
No cost listed
New electrical distribution of buchanan street mall park renovation project. includes new pge connection conduit installation and power distribution, pedestals, meter and lighting. designed and submittals approved by alexis ng and brett desmarais with sfdpw. (7 light, 1new service,50a, 2 pole main breaker, (2) 2 in conduits and 5 circuits)
871 Buchanan StHayes Valleyissued#Electrical
Aug 8, 2025
No cost listed
Install 1 new domestic water distribution system & 1 new irrigation system at buchanan st mall. domestic water shall be comprised of 88' of pipe btw city water meter to drinking fountain w/ install of 1 ea backflow & a demestic water stub out. irrigation system shall be comprised 7' pipe btw city water meter to 1ev backflow
1151 Buchanan StWestern Additionissued#Plumbing
Aug 8, 2025
No cost listed
New electrical distribution of buchanan street mall park renovation project. includes new pge connection conduit installation and power distribution, pedestals, meter and lighting. designed and submittals approved by alexis ng and brett desmarais with sfdpw. (21 lights, 1new service,50a, 2 pole main breaker, (2) 2 in conduits and 7 circuits)
1051 Buchanan StWestern Additionissued#Electrical
Aug 8, 2025
No cost listed
Domestic: 1 ea backflow and 57 feet of pipe to dringking fountain. irrigation: 9 feet of pipe to 1 ea backflow.
951 Buchanan StWestern Additionissued#Plumbing
Aug 8, 2025
No cost listed
Domestic: 1 ea backflow and 57 feet of pipe to drinking fountain. irrigation: 7 feet of pipe to 1 ea backflow
1051 Buchanan StWestern Additionissued#Plumbing
Aug 8, 2025
No cost listed
1 new domestic water distribution system and 1 new irrigation system at buchanan st mall. domestic water shall be comprised of 45' pipe b/w city installed water meter to drinking fountain with install of 1 ea backflow, irrigation system shall be comprised of 7' of pipe b/w city installed water meter to 1ea backflow. domestic = 45 ft of pipe and 1 each backflow. irrigation: 7' of pipe to 1 backflow.
1225 Buchanan StWestern Additionissued#Plumbing