Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$15.3K
Most recent job
2mo ago
Jul 27, 2026
195 permits on record. Values are declared at filing.
Jul 27, 2026
$15.5K
In-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).
9 Surrey StGlen Parkcomplete#Bathroom remodel
Jul 27, 2026
No cost listed
In-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).
9 Surrey StGlen Parkcomplete#Electrical
Jul 27, 2026
No cost listed
In-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).
9 Surrey StGlen Parkcomplete#Bathroom remodel#Plumbing
Jul 22, 2026
No cost listed
In-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).
9 Surrey StGlen Parkfiled#Bathroom remodel#Plumbing
Jul 22, 2026
No cost listed
In-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).
9 Surrey StGlen Parkfiled#Electrical
Jul 13, 2026
$10K
In-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
1340 D Scott StWestern Additioncomplete#Bathroom remodel
Jul 13, 2026
No cost listed
In-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
1340 D Scott StWestern Additioncomplete#Bathroom remodel#Plumbing
Jul 13, 2026
No cost listed
In-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
1340 D Scott StWestern Additioncomplete#Electrical
Jun 25, 2026
No cost listed
Replace (e) fan/light with nw gfi outlet at same location
601 Van Ness AvWestern Additionissued#Electrical
Jun 25, 2026
No cost listed
Remove tub, install shower/tub combo and acrylic walls
601 Van Ness AvWestern Additionissued#Bathroom remodel#Plumbing
Jun 16, 2026
$30K
Unit #742: combo tub and shower to combo tub and shower replacement. remove tub, install new tub & acrylic walls. install new tile shower pan. install new floors, vanity, mirror/med cabinet, vanity, lights. replace existing fan/light with new gfi outlet at same location.
601 Van Ness AvWestern Additionissued#Kitchen remodel#Bathroom remodel
Jun 16, 2026
No cost listed
Associated electrical for the demo existing shower base, valve and wall surrounds. install new therapy walk in tub, valve, and acrylic wall surrounds.
142 Springfield DrSunset/Parksideissued#Electrical
Jun 16, 2026
No cost listed
Demo existing shower base, valve and wall surrounds. install new therapy walls in tub, valve, and acrylic wall surrounds.
142 Springfield DrSunset/Parksidecomplete#Bathroom remodel#Plumbing
Jun 16, 2026
No cost listed
Demo existing tub, valve, and surround. install new walk in shower. frame new shower wall, replace sink.
408 Jersey StNoe Valleycomplete#Bathroom remodel#Plumbing
Jun 16, 2026
No cost listed
Associated electrical for the demo existing tub, valve, and surround. install new walk in shower wall, replace sink, replace exhaust fan, sub floor repair flooring. install can light.
408 Jersey StNoe Valleycomplete#Electrical
Jun 9, 2026
$20K
Demo (e) shower base, valve and wall surrounds. install new therapy walk in tub, valve and acrylic wall surrounds.
142 Springfield DrSunset/Parksidecomplete#Bathroom remodel#Demolition & abatement
Jun 9, 2026
$25K
Demo (e) tub, valve & surround. install new walk in shower. frame new shower wall, replace sink. replace exhaust fan, sub floor repair, flooring, install can light.
408 Jersey StNoe Valleycomplete#Bathroom remodel#Demolition & abatement
Apr 29, 2026
No cost listed
Revision to e202603259865: add scope of work, add 2 gfci home runs and 1 gfci electical for walk in tub in bathroom.
3035 23rd AvSunset/Parksidecomplete#Electrical
Apr 23, 2026
No cost listed
Bathroom remodel: no change to layout, remove and replace shower valve.
240 Lombard StNorth Beachcomplete#Bathroom remodel#Plumbing
Mar 27, 2026
$24K
Unit 726: bathtub to shower conversion w/no alterations to unit layout. replacing floor tile. maintain ada details. 2" max height of threshold. provide back in walls for future grab bars.
240 Lombard StNorth Beachcomplete#Bathroom remodel