Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$1.2M
Most recent job
4.4y ago
May 18, 2022
18 permits on record. Values are declared at filing.
May 18, 2022
No cost listed
Administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2020-1204-0242
2 Avenue Of The PalmsTreasure Islandcomplete
May 18, 2022
No cost listed
Administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 202101122537
2 Avenue Of The PalmsTreasure Islandcomplete
May 18, 2022
No cost listed
Administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit2021-0128-3576.
2 Avenue Of The PalmsTreasure Islandcomplete
May 18, 2022
No cost listed
Administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 202112073882
2 Avenue Of The PalmsTreasure Islandcomplete
May 18, 2022
No cost listed
Administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2019-1120-7799
2 Avenue Of The PalmsTreasure Islandcomplete
May 18, 2022
No cost listed
Administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2020-0818-2044
2 Avenue Of The PalmsTreasure Islandcomplete
May 18, 2022
No cost listed
Administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2020-0916-4281
2 Avenue Of The PalmsTreasure Islandcomplete
May 18, 2022
No cost listed
Administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2021-0112-2536.
2 Avenue Of The PalmsTreasure Islandcomplete
May 17, 2022
No cost listed
Administrtive permit to document change of address from 1 avenue of the palms to 2 avenue of the palms for permits 2019-1120-7799, 2020-0818-2044, 2020-0916-4281,2020-1204-0242,2021-0112-2536,20210112-2537,2021-0128-3576,2021-1207-3882
2 Avenue Of The PalmsTreasure Islandcancelled
Dec 7, 2021
No cost listed
Ferry terminal revision to pa 2019-1120-7799 construction of a submerged rock dike between the concrete sheet pile breakwater & the landing slope at offshore location
1 Avenue Of The PalmsTreasure Islandcomplete
Mar 23, 2021
No cost listed
2951 hyde street: install hose reels, a 1 1/2" tap for portable water, externally mounted conduit, flex coonections, etc. work done outside.
999 Unknowncomplete#Plumbing
Jan 28, 2021
$107K
Ferry terminal fire protection system - construction of 4" dry standpipe fire protection system for the fixed pier (2020-0818-2044) and ferry float (2020-0916-4281)
1 Avenue Of The PalmsTreasure Islandcomplete#Fire sprinklers & alarms
Jan 12, 2021
$1.1M
Fixed pier utilities- construct power, water, comms and low volts systems on fixed pier-pa 202008182044, ferry float platform-202009164281, ramps, gangway-pa 202012040242
1 Avenue Of The PalmsTreasure Islandcomplete
Jan 12, 2021
$3.5M
Treasure island ferry terminal - construction of glass windscreen, roof sheathing and finish schedule on the fixed pier structure. ref pa 202008182044.
1 Avenue Of The PalmsTreasure Islandcomplete
Dec 4, 2020
$750K
Priority plan review treasure island project. const of 2,260 sf of aluminum platforms, mechanically actvatep ramps, and stairs mounted top side of ferry float per pa #202009164281, construction of , 884 sf aluminum gangway connecting ferry loat platforms to fixed pier per pa #202008182044.
1 Avenue Of The PalmsTreasure Islandcomplete
Sep 16, 2020
$1.2M
Construction of a 42'x135" steel ferry landing float, reference to pa #202008182044 (concrete pier), pa #201911207799 (concrete breakwater) prior work.
1 Avenue Of The PalmsTreasure Islandcomplete
Aug 18, 2020
$2.3M
Construction of 156' concrete pier spanning shore abutment and (e) steel piles, reference pa #201911207799 for prior work including permitting of (e) steel piles. ferry terminal.
1 Avenue Of The PalmsTreasure Islandcomplete
Nov 20, 2019
$15.2M
Construction of new 760' long concrete breakwater constisting of concrete sheet piles,concrete batter piles and concrete cap. in addition, 8 each steel pipe piles will be driven for future construction of a ferry terminal.
1 Avenue Of The PalmsTreasure Islandcomplete