Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
4mo ago
Jun 16, 2026
12 permits on record. Values are declared at filing.
Jun 16, 2026
No cost listed
Installation of temporary power to be used in conjunction with 2023-0309-3340 for commercial construction
33 Banbury DrWest of Twin Peaksissued#Electrical
Mar 10, 2026
No cost listed
Installation of temporary power to be used in conjunction with 202509245990 for new commercial construction
1310 Junipero Serra BlLakeshoreissued#Electrical
Feb 12, 2026
No cost listed
Online electrical permit: 60 of buildings of 6 dwelling units or less. installation of temporary power pole to be used in conjunction with building permit# 202509245990.
1310 Junipero Serra BlLakeshorefiled#Electrical
Feb 12, 2026
No cost listed
Online electrical permit: 60 of buildings of 6 dwelling units or less.
1310 Junipero Serra BlLakeshorefiled#Electrical
Apr 2, 2024
No cost listed
Online electrical permit: 4 of 4 - 9 floors. installation of temporary power pole .
822 Geary StTenderloinfiled#Electrical
Apr 2, 2024
No cost listed
Temp power for tenant improvement
822 Geary StTenderloinissued#Electrical
May 9, 2023
No cost listed
Installation of temporary power pole to be used in conjunction with ew2022-11077094 for commercial construction for ev charging/data offload infrastructure
241 Loomis StBayview Hunters Pointcancelled#EV charger
Feb 14, 2022
No cost listed
Installation of 100a temp power pole
84 Commonwealth AvPresidio Heightscomplete#Electrical
Aug 16, 2021
No cost listed
Installation of temporary 24' 200a o/h meter pole for construction
101 Utah StMissioncomplete#Electrical
Feb 24, 2020
No cost listed
200a overhead temp meter pole.
2201 Bay Shore BlBayview Hunters Pointexpired#Electrical
Mar 7, 2019
No cost listed
(1) 200a temporary meter pole for demolition.
345 04th StSouth of Marketcomplete#Electrical
Feb 21, 2019
No cost listed
Temp power for asbestos abatement
1310 Funston AvInner Sunsetcomplete#Electrical