Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
1mo ago
Sep 3, 2026
42 permits on record. Values are declared at filing.
Sep 3, 2026
No cost listed
Work category: 5p; condenser water piping for 2 new heat pumps
400 Howard StFinancial District/South Beachcomplete#Heating & cooling
Jul 13, 2026
No cost listed
Work category: 5m; remove and replace refrigerant piping
301 Van Ness AvHayes Valleycomplete#Heating & cooling
Jul 2, 2026
No cost listed
Work category: 5m; 22nd fl: add 2 heat pumps, add 2 transfer fans, relocate one vav box, add ceiling diffusers, new ductwork, new condenser water piping & condensate drain piping,
595 Market StFinancial District/South Beachcomplete#Heating & cooling#Plumbing
Jul 2, 2026
No cost listed
Work category: 5m; 20th fl: relocate one heat pump, add one transfer fan, relocate one vav box, new diffusers, new ductwork, new condenser water piping and new condensate drain piping.
595 Market StFinancial District/South Beachcomplete#Heating & cooling#Plumbing
May 14, 2026
No cost listed
Work category: 5m; 7th fl: add 6 vav boxes, add one transfer fan, new ductwork, and new ceiling & sidewall grilles.
160 Pine StFinancial District/South Beachissued#Heating & cooling
Mar 18, 2026
No cost listed
Work category: 2pb; plumbing for new fitness center. to include showers and single use restroom
400 Howard StFinancial District/South Beachcomplete#Bathroom remodel#Plumbing
Feb 16, 2026
No cost listed
Work category: 5m; work on the 2nd floor: install 8 heat pumps, replace one mini split ac system, add 3 fire smoke dampers, add one transfer fan, add one vav box, new sheet metal ductwork, new condenser water supply & return piping, and new ceiling supply diffusers, & ceiling return/exhaust air grilles.
801 Montgomery StChinatowncomplete#Heating & cooling
Feb 2, 2026
No cost listed
Work category: 1p; new single use restroom
2350 Green StMarinacomplete#Plumbing
Dec 9, 2025
No cost listed
Work category: 2pa; condenser water piping for 1 heat pump
201 03rd StFinancial District/South Beachcomplete#Heating & cooling
Aug 12, 2025
No cost listed
Suite 1450. ref. nov #202540973. (4) new vav's, (3) heating coils, (1) transfer fan, new heating waterpiping, new ductwork, and ceiling diffusers.
388 Market StFinancial District/South Beachcomplete#Heating & cooling
Aug 12, 2025
No cost listed
Suite 1460. ref. nov #202540973. (4) new vav's, (2) heating coils, (1) ductwork, and ceiling diffusers.
388 Market StFinancial District/South Beachcomplete#Heating & cooling
Aug 12, 2025
No cost listed
Suite 1420. ref. nov #202540973. (7) new vav's, (5) heating coils, (1) transfer fan, new heating waterpiping, new ductwork, and ceiling diffusers.
388 Market StFinancial District/South Beachcomplete#Heating & cooling
Apr 9, 2025
No cost listed
Work category: 5p; install drinking fountain
400 Howard StFinancial District/South Beachcomplete#Plumbing
Jan 21, 2025
No cost listed
Work category: 2pb; install new plumbing from existing sewer to new men’s and women’s restrooms.
320 Dolores StCastro/Upper Marketcomplete#Plumbing
Nov 18, 2024
No cost listed
Work category: 1p; replace approx. 50' of gas line leaking in driveway
1111 Gough StWestern Additioncomplete#Plumbing
Jun 18, 2024
No cost listed
Work category: 5p; install new drinking fountain. remove and reinstall restroom fixtures for new finishes.
240 Stockton StFinancial District/South Beachcomplete#Plumbing
May 17, 2024
No cost listed
Work category: 5m; 4th fl: add one vav with heating coil; relocate existing vav's; new ductwork, diffusers, & heating water piping; add one pneumatic thermostat and relocate existing pneumatic thermostats.
250 Montgomery StFinancial District/South Beachexpired#Heating & cooling
Mar 21, 2024
No cost listed
Work category: 5p; re rough plumbing for new break room sink location
185 Post StFinancial District/South Beachcomplete#Plumbing
Mar 7, 2024
No cost listed
Work category: 1p; condensate piping for ac unit
601 California StFinancial District/South Beachcomplete#Plumbing
Jan 29, 2024
No cost listed
Work category: 2pa; waste, vent, hot and cold waters for hand and bar sink. replace sinks and faucets in restrooms with new. remove and replace restroom fixtures for new tile work.
1 Portcomplete#Plumbing