Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
—
Most recent job
1.9y ago
Nov 12, 2024
1 permits on record. Values are declared at filing.
Nov 12, 2024
No cost listed
Installing 240 volts 40amp level 2 ev charging equipment with dcc-9 load management system. ev equipment to be surface mounted on interior garage wall. dcc-9 load management system will be mounted next to the 120/240 80 amp 3 wire single phase main service panel.
212 Day StNoe Valleyissued#EV charger