Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$80K
Most recent job
6mo ago
Apr 15, 2026
11 permits on record. Values are declared at filing.
Apr 15, 2026
No cost listed
To obtain final inspection for work approved under pa 202101052117,202011209381,202002144559. all work is complete.
368 Collingwood StCastro/Upper Marketissued
Aug 20, 2025
$60K
Replacing in same location dryrott bathroom wall and kitchenfuring wall. both are same location. also, sheetrock @ceiling that had mold. replace wood framing, insulation and sheetrock at areas described above. remodel (1) kitchen and (1) bath.
357 Collingwood StCastro/Upper Marketissued#Kitchen remodel#Bathroom remodel
Aug 15, 2025
No cost listed
Work category: 1p; we are installing (1) clothes washer to existing closet location. we are also modifying existing locations of kitchen sink, bathroom fixtures-water closet, lavatory, and tub. all same vicinity except moving a couple of feet one way.
357 Collingwood StCastro/Upper Marketexpired#Bathroom remodel#Plumbing
Apr 23, 2025
No cost listed
Repair a broken 2" or 3" sanitary line @ unit 366 and install a clean out in the driveway for usage. no accesible clean out. the clean out will located @ exterior/garage entrance. inclusive of underground work.
366 Collingwood StCastro/Upper Marketcomplete#Plumbing
Aug 26, 2021
No cost listed
Work category: 1m; added (4) vrf units at the interior of living spaces with (1) 1.5 ton condenser located within confines of property line at right side of property. all work is for unit 366 collingwood.
366 Collingwood StCastro/Upper Marketcomplete#Heating & cooling
Jul 26, 2021
No cost listed
Work category: 2pb; repair the underground sanitary waste and vent in order to rough in a bathroom with water closet and lavatory and shower.
366 Collingwood StCastro/Upper Marketcomplete#Bathroom remodel#Plumbing
May 20, 2021
No cost listed
Work category: 2m ; one high efficiency furnance and one heat pump
231 Connecticut StPotrero Hillcomplete#Heating & cooling
Jan 5, 2021
$150K
Remodel of unit 366: conversion of 1/2 bathh to full bathroom. addition of 1/2 bath & conversion of living space to bedroom. ext: replace glazing at facade units 366 & 368.
366 Collingwood StCastro/Upper Marketexpired#Windows#Bathroom remodel#Siding & facade
Dec 14, 2020
$15K
Unit#366, remodel kitchen, no change in wall and opening layout. to abate complaint no. 202069081.
366 Collingwood StCastro/Upper Marketcomplete#Kitchen remodel
Nov 20, 2020
$100K
Enlarge (e) decks sewing units 366 & 368
366 Collingwood StCastro/Upper Marketexpired#Decks & stairs
Feb 20, 2020
No cost listed
366 & 368: replace (2) bathrooms & (1) kitchen and repair existing adu piping @ 368, condensate at 368. tankless water heater at 368
368 Collingwood StCastro/Upper Marketcomplete#Bathroom remodel#Water heater