Contractor on San Francisco permit records
This page is built from public San Francisco permit records. It shows permits this firm pulled, not the quality of its work, and it isn't a recommendation. We don't check whether a contractor is currently licensed, bonded or insured. Verify that at the CSLB before you hire.
SF jobs on record
0
Jobs in the past year
0
Typical job size
$50K
Most recent job
2mo ago
Jul 29, 2026
12 permits on record. Values are declared at filing.
Jul 29, 2026
No cost listed
To obtain final inpsection for work approved under pa #202507160930. all work is complete.
718 Long Bridge StMission Bayissued
Jul 16, 2025
$50K
Install 31 ev charging station in and around parking garage. assigned owner, not avaiable to general public.
718 Long Bridge StMission Bayissued#EV charger
Sep 27, 2022
No cost listed
Updating the current main to 200amp service
642 Edinburgh StExcelsiorissued#Electrical
Aug 6, 2020
No cost listed
Installing 20 new ev charging stations on existing ev panel to expand city's charging capacity for their fleet of electric vehicles.
355 McAllister StTenderloinexpired#EV charger
Aug 5, 2020
No cost listed
Installing 20 ev charging stations for use by tenants of the building.
255 Berry StMission Baycomplete#EV charger
Jun 23, 2020
No cost listed
Install (24) level 2 charging stations for tenants of 5800 3rd st. condominiums
5800 03rd StBayview Hunters Pointexpired#Electrical
May 5, 2020
No cost listed
Installing (51) level-2 electric vehicle charging stations for residents of the condominium complex.
420 Mission Bay Blvd North BlMission Bayexpired#EV charger
Apr 20, 2020
No cost listed
Installing wiring to charging stations that will be fed from electrical room where infrastructure panels and transformers were installed under a different permit. we will utilize (11) 100a load centers to consolidate wire runs from e-room to charging stations.
49 South Van Ness AvMissioncomplete#Electrical
Apr 9, 2020
No cost listed
We will be installing 81 level-2 electric vehicle charging stations for specific residents at the arden condominiums. as part of our contract with arden, we are installing enough capacity and infrastructure to expand in the future to a charging station in every single parking space.
718 Long Bridge StMission Baycomplete#EV charger
Feb 9, 2020
No cost listed
Install (52) electric vehicle charging stations for use by employees at adobe sf, stations are to be controlled by powerflex load management system
601 Townsend StMission Baycomplete#EV charger
Dec 6, 2016
No cost listed
Replace main electrical disconnect.
666 Post StNob Hillcomplete#Electrical
Nov 13, 2016
No cost listed
Unit 1601: kitchen & bathroom remodel. move subpanel from kitchen to bedroom.
666 Post StNob Hillcomplete#Electrical